The Division estimates approximately twenty-four thousand cubic yards (24,000 yd3) of <br /> overburden material is located in the pile. Please note this figure is an estimate of the <br /> material that will need to be graded into the pond. CONTRACTORS are responsible for <br /> verifying all estimates prior to bid submittal. No outside fill or organic matter shall be <br /> backfilled in the pit unless approved by the PROJECT MANAGER. At NO time shall any <br /> water from the pond be allowed to discharge offsite during construction. <br /> Measurement and Payment <br /> Measurement for payment shall be made of the actual unit quantities provided and <br /> installed according to specification, at the unit cost indicated under ITEM 3.0 on the Bid <br /> Schedule. The unit price bid for overburden pile removal and highwall reduction will cover <br /> all costs for completing the activities required under this Task. Payment shall be as this task <br /> is completed and approved by the PROJECT MANAGER. Such payment shall be <br /> considered full compensation for all labor, materials, equipment, transportation and all <br /> other items and materials necessary and incidental to the completion of ITEM 3.0. <br /> ITEM 4.0 S BAR C FARMS BACKFILL AND REDUCE HIGHWALL <br /> Reclamation of the S Bar C Farms site is limited to reducing the highwall on the northern <br /> edge of Pond 3. The highwall is approximately 10 to 20 feet above the groundwater <br /> elevation, and approximately 2,500 long. Pond water depths in this area range from 19 to <br /> 30 feet deep. See attached S Bar C Farms Map for further detail. <br /> Highwall elimination shall start approximately 50 feet back from the edge of Pond 3. <br /> Material shall be cut and removed with a large excavator to achieve an overall slope of <br /> 3H:1 V or less along the northern edge of Pond 3 for a distance of 2,500 feet. The material <br /> cut to eliminate the highwall shall be placed directly into Pond 3. At NO time shall any <br /> water from the Pond 3 be allowed to discharge offsite during construction. <br /> The Division estimates approximately thirty-one thousand cubic yards (31,000 yd3) of <br /> material is required to be cut to eliminate the highwall to a 3H:1 V slope or less, as directed <br /> by the PROJECT MANAGER. Please note this figure is an estimate of the material that will <br /> need to be graded into the pond. CONTRACTORS are responsible for verifying all <br /> estimates prior to bid submittal. No outside fill or organic matter shall be backfilled in the <br /> pit unless approved by the PROJECT MANAGER. <br /> Measurement and Payment <br /> Measurement for payment shall be made of the actual unit quantities provided and <br /> installed according to specification, at the unit cost indicated under ITEM 4.0 on the Bid <br /> Schedule. The unit price bid for highwall reduction will cover all costs for completing the <br /> activities required under this Task. Payment shall be as this task is completed and <br /> approved by the PROJECT MANAGER. Such payment shall be considered full <br /> compensation for all labor, materials, equipment, transportation and all other items and <br /> materials necessary and incidental to the completion of ITEM 4.0. <br /> ITEM 5.0 S BAR C FARMS TOPSOIL REPLACEMENT <br /> Following completion of highwall reduction under Item 4.0, cover material will be <br /> excavated from an adjacent overburden pile and spread over the reclaimed area. <br /> Page 10 of 14 <br />