Cover material shall be placed to a minimum depth of one foot and cover the 2,500 <br /> length of highwall for a width of 75 feet (approximately 4.3 acres). The pile is directly east <br /> of the project area and is noted on the S Bar C Farms Map. <br /> The Division estimates approximately seven thousand cubic yards (7,000 yd3) of <br /> overburden material is required to cover the disturbance associated with reclaiming the <br /> highwall. Please note this figure is an estimate of the material required for topsoil <br /> replacement. CONTRACTORS are responsible for verifying all estimates prior to bid <br /> submittal. Slopes shall be left rough in preparation for seedbed. <br /> Measurement and Payment <br /> Measurement for payment shall be made of the actual unit quantities provided and <br /> installed according to specification, at the unit cost indicated under ITEM 5.0 on the Bid <br /> Schedule. The unit price bid for topsoil replacement will cover all costs for completing the <br /> activities required under this Task. Payment shall be as this task is completed and <br /> approved by the PROJECT MANAGER. Such payment shall be considered full <br /> compensation for all labor, materials, equipment, transportation and all other items and <br /> materials necessary and incidental to the completion of ITEM 5.0. <br /> ITEM 6.0: REVEGETATE ALL DISTURBED AREAS AT HARD SCRABBLE PIT <br /> Following removal of the stockpile and reduction of the highwall to 3H:1 V, all disturbed <br /> areas shall be seeded. It is estimated that two (2) acres of disturbance will need to be <br /> seeded. Areas will be revegetated according to the Revegetation Specifications, Section <br /> 20.0 in the General Bid Specifications, 2009. Seed will be supplied by the OWNER. The <br /> seed shall be incorporated into the soil by raking or chain dragging then lightly <br /> compacted to provide good seed-soil contact. <br /> Measurement and Payment <br /> Payment for this item will be made at the unit price established in Item 6.0 of the Bid <br /> Schedule. Measurement for payment will be made to the nearest tenth (0.1) acre of area <br /> revegetated. The price bid shall include all costs for labor, materials, equipment and all <br /> other items necessary for revegetation as described in this item. Such payment shall be <br /> considered full compensation for all labor, materials, equipment and all other items <br /> necessary and incidental to the completion of Item 6.0. <br /> ITEM 7.0: REVEGETATE ALL DISTURBED AREAS AT S BAR C PIT <br /> Following application of the growth medium, all disturbed areas shall be seeded. Areas <br /> that require seeding include the highwall reduction area and a portion of the site <br /> reclaimed in 2016 for a total of thirty-seven (37) acres. Areas will be revegetated <br /> according to the Revegetation Specifications, Section 20.0 in the General Bid <br /> Specifications, 2009. Seed will be supplied by the OWNER. The seed shall be <br /> incorporated into the soil by raking or chain dragging then lightly compacted to provide <br /> good seed-soil contact. <br /> Measurement and Payment <br /> Payment for this item will be made at the unit price established in Item 7.0 of the Bid <br /> Page 11 of 14 <br />