My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-05-29_GENERAL DOCUMENTS - M1981118
DRMS
>
Day Forward
>
General Documents
>
Minerals
>
M1981118
>
2018-05-29_GENERAL DOCUMENTS - M1981118
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2022 2:51:22 PM
Creation date
1/21/2022 10:49:34 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981118
IBM Index Class Name
General Documents
Doc Date
5/29/2018
Doc Name Note
Table Mountain Quarry Project
Doc Name
IMP Closeout Files
From
DRMS
To
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ITEM 2.0 PROJECT SAFETY,HEALTH,AND ENVIRONMENTAL ACTION PLAN <br /> (SHEAP) <br /> The job will involve working around inactive mine features and hazards, and it is the responsibility <br /> of the CONTRACTOR to be aware of all MSHA and OSHA regulations which apply to this <br /> contract and MSHA certification will be required. This item includes all the Contractors <br /> expenses for employee time, labor, materials, and safety equipment and safety training necessary <br /> for preparing and executing a job safety plan. The Successful Bidder will be required to prepare <br /> the Project Safety Plan (SHEAP) and submit it for review and approval to the DRMS. The <br /> CONTRACTOR is required to develop and implement a Project Safety Plan in conjunction with <br /> project implementation. PROJECT MANAGER must receive the Project Safety Plan within five <br /> (5) working days of Notice to Proceed date. It is expected that the Project Safety Plan will be <br /> comprehensive and sufficiently detailed so that every member of the work crew (including sub- <br /> contractors) on site understands their responsibilities and the responsibilities of CONTRACTOR <br /> to ensure a safe and injury free work place. <br /> The Project Safety Plan must be submitted to: <br /> TC Wait <br /> 1313 Sherman Street, Room 215 <br /> Denver, CO 80203 <br /> FAX (303) 832-8106 <br /> At a minimum,the plan MUST provide specific, detailed responses to the following list of safety <br /> concerns that are likely to present themselves during the course of Project completion. When <br /> developing the Project Safety Plan, please list specific types of equipment to be provided by <br /> CONTRACTOR,including subcontractor(s),in order to address the safety concern, or specifically <br /> state the actions to be taken by CONTRACTOR, including crew and subcontractor(s) order to <br /> address the safety concern. <br /> Upon receipt of the SHEAP, the OWNER will either accept the plan, or request that more detail <br /> be provided. <br /> The CONTRACTOR and their employees or sub-contractors are expected to follow the SHEAP <br /> during performance of every component of the Project. If the PROJECT MANAGER determines <br /> that the SHEAP is not being followed, either in whole or in part, the Project may be immediately <br /> suspended, without stopping the job clock, until such time as the SHEAP is implemented. <br /> NOTE that the PROJECT MANAGER may suspend the work, either wholly or in part,for such <br /> period or periods as he/she may deem necessary, due to unsafe work practices. The job clock <br /> will NOT be stopped in such a circumstance. <br /> Page 9 of 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.