Laserfiche WebLink
equipment, and costs associated with demobilization and clean-up of the work site following <br /> completion of the Project. Please see Specification 1.0, Mobilization / Demobilization of the <br /> General Bid Specifications, 2009. <br /> CONTRACTOR will dispose of waste materials, including but not limited to refuse, garbage, <br /> sanitary wastes, spent solvents; oil and other petroleum products off of the Project Area in <br /> accordance with applicable laws and regulations. CONTRACTOR will specify to PROJECT <br /> MANAGER proposed methods for all waste collection and disposal, modes of waste transport, <br /> and waste disposal facilities and locations CONTRACTOR and subcontractors will use while <br /> performing the work, including making any necessary arrangements for waste collection and <br /> disposal. Any fees or charges required to be paid for collection, transport or disposal of waste <br /> materials shall be paid by CONTRACTOR.A portable toilet will be required on the site throughout <br /> the duration of construction. <br /> NOXIOUS WEEDS <br /> In an attempt to mitigate the rampant spread of noxious weeds from one area to another, there <br /> will be a mandatory inspection of all equipment to be used during the course of construction at <br /> the project site. Prior to inspection, it is the responsibility of the Contractor to employ whatever <br /> cleaning methods are necessary to ensure that all equipment is free of soil, seeds,vegetative <br /> matter, or other debris that could contain or hold seeds. Equipment shall be considered clean <br /> when a visual inspection determines the equipment free of such material. The CONTRACTOR <br /> will be required to notify the PROJECT MANAGER in advance of mobilizing equipment on site <br /> to arrange for inspection. Disassembly of equipment components will not be required. <br /> At its expense, CONTRACTOR will comply with all applicable federal, state, and local laws, <br /> ordinances,rules and regulations relating to the work,the site,and any materials and/or equipment <br /> provided by CONTRACTOR. <br /> Upon completion of the work under this Contract,the CONTRACTOR shall remove all temporary <br /> facilities, temporary infrastructure and equipment. The CONTRACTOR shall remove from the <br /> work site all rubbish,unused materials, and leave all areas in good order and condition, subject to <br /> the approval of the PROJECT MANAGER. <br /> Measurement and Payment <br /> Payment for Item 1.0 shall be reflected in a lump sum quote price under Item 1.0 on the Bid <br /> Schedule. Payment shall include all the CONTRACTOR'S expenses for mobilization of <br /> equipment to the site,transportation of the equipment within the project area,employee time,labor <br /> and materials necessary to accomplish the requirements of this item, compliance with the <br /> conditions and requirements described in this item description, and final clean-up of the work <br /> place. <br /> Page 8 of 15 <br />