My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-12-27_INSPECTION - M2001077
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M2001077
>
2021-12-27_INSPECTION - M2001077
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2021 12:37:44 PM
Creation date
12/27/2021 10:51:30 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2001077
IBM Index Class Name
Inspection
Doc Date
12/27/2021
Doc Name
Inspection Report
From
DRMS
To
Rio Blanco County
Inspection Date
12/17/2021
Email Name
ACY
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BULLDOZER RIPPING WORK <br /> Task description: Rip Compacted areas <br /> Site: Piceance Pit Permit Action: SO3 Permit/Job#: M2001077 <br /> PROJECT IDENTIFICATION <br /> Task#: OlA State: Colorado Abbreviation: None <br /> Date: 12/22/2021 County: Rio Blanco Filename: M077-01a <br /> User: ACY <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COST <br /> Basic Machine: Cat D8T-8SU Horsepower: 310 <br /> Ripper Attachment: 3-Shank Ripper Shift Basis: 1 per day <br /> Data Source: (CRG) <br /> Cost Breakdown: <br /> Utilization% <br /> Ownership Cost/Hour: $97.46 NA <br /> Operating Cost/Hour: $97.63 100 <br /> Ripper Ownership Cost/Hour: $15.19 NA <br /> Ripper Operating Cost/Hour: $9.94 100 <br /> Operator Cost/Hour: $41.30 NA <br /> Total Unit Cost/Hour: $261.52 <br /> Total Fleet Cost/Hour: $261.52 <br /> MATERIAL QUANTITIES Selected estimating method: Area <br /> Alternate Methods: <br /> Seismic: NA Bank Volume: NA BCY NA <br /> Area: 5.56 acres Rip Depth(ft): 2.00 Volume: 17,940 BCY or CCY <br /> Source of estimated quantity: Compacted stockpile area <br /> HOURLY PRODUCTION <br /> Seismic: <br /> Seismic Velocity: NA feet/second <br /> Area: <br /> Average Ripping Depth: 2.56 feet/pass <br /> Average Ripping Width: 7.08 feet/pass <br /> Average Ripping Length: 100.00 feet/pass <br /> Average Dozer Speed: 88.00 feet/minute <br /> Average Maneuver Time: 0.25 minutes/pass <br /> Production per unit area: 0.703 acres/hour <br /> Job Condition Correction Factors <br /> Unadjusted Hourly Unit Production: 0.703 Acres/hr <br /> Site Altitude: 5,700 feet <br /> Altitude Adj: 1.00 (CAT HB) <br /> Job Efficiency: 0.83 (1 shift/day) <br /> Net Correction: 0.83 multiplier <br /> Adjusted Hourly Unit Production: 0.58 Acres/hr <br /> Adjusted Hourly Fleet Production: 0.58 Acres/hr <br /> JOB TIME AND COST <br /> Fleet size: 1 Grader(s) Total job time: 9.52 Hours <br /> Unit cost: $447.927 Per acre Total job cost: $2,490 <br /> CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.