Laserfiche WebLink
Scraper Worksheet Cont'd Task#02A Page 1 of 2 <br /> SCRAPER TEAM WORK <br /> Task description: Transport and apply topsoil <br /> Site: Piceance Pit Permit Action: S03 Permit/Job#: M2001077 <br /> PROJECT IDENTIFICATION <br /> Task#: 02A State: Colorado Abbreviation: None <br /> Date: 12/22/2021 County: Rio Blanco Filename: M077-02a <br /> User: ACY <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COSTShift basis: 1 per day <br /> Equipment Description <br /> -Scraper: Cat 637G <br /> -Dozer: NA <br /> Support Equipment-Load Area: Cat D8T-8SU <br /> -Dump Area: Cat D8T-8SU <br /> Road Maintenance—Motor Grader: NA <br /> -Water Truck: NA <br /> Cost Breakdown: Scraper Work Team Support E ui ment Maintenance Equipment <br /> Scraper Dozer Load Area Dump Area Motor Grader Water Truck <br /> %Utilization-machine: 100 NA 30 50 NA NA <br /> Ownership cost/hour: $218.34 NA $97.46 $97.46 NA NA <br /> Operating cost/hour: $208.00 NA $29.29 $48.82 NA NA <br /> %Utilization-ripper: NA NA NA NA NA NA <br /> Ripper own.cost/hour: NA NA $0.00 $0.00 NA NA <br /> Ripper op.cost/hour: NA NA $0.00 $0.00 NA NA <br /> Operator cost/hour: $30.90 NA $41.30 $41.30 NA NA <br /> Unit Subtotals: $457.24 NA $168.05 $187.58 NA NA <br /> Number of Units: 1 0 1 1 0 0 <br /> Group Subtotals: Work: $457.24 Support: $355.63 Maint: $0.00 <br /> Total work team cost/hour: $812.87 <br /> MATERIAL QUANTITIES <br /> Initial volume: 8,991 CCY Swell factor: 1.115 <br /> Loose volume: 10,025 LCY <br /> Source of estimated volume: 8.36 ac at 8"thick <br /> Source of estimated swell factor: Cat Handbook <br /> HOURLY PRODUCTION <br /> Scraper Bowl(volume)Basis: <br /> Material weight: 2,100 lbs/LCY Struck Volume: 24.00 LCY <br /> Material description: Earth-Loam Heaped Volume: 34.00 LCY <br /> Rated Payload: 81,600 pounds Average Volume: 29.00 LCY <br /> Payload Capacity: 38.86 LCY Adjusted Capacity: 29.00 LCY <br /> CIRCES Cost Estimating Software <br />