My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-12-27_INSPECTION - M2001077
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M2001077
>
2021-12-27_INSPECTION - M2001077
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2021 12:37:44 PM
Creation date
12/27/2021 10:51:30 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2001077
IBM Index Class Name
Inspection
Doc Date
12/27/2021
Doc Name
Inspection Report
From
DRMS
To
Rio Blanco County
Inspection Date
12/17/2021
Email Name
ACY
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COST SUMMARY WORK <br /> Task description: Post inspection update 2021 <br /> Site: Piceance Pit Permit Action: S03 Permit/Job#: M2001077 <br /> PROJECT IDENTIFICATION <br /> Task#: ACY State: Colorado Abbreviation: None <br /> Date: 12/22/2021 County: Rio Blanco Filename: M077-ACY <br /> User: ACY <br /> Agency or organization name: DRMS <br /> TASK LIST(DIRECT COSTS) <br /> Task Form Fleet Task <br /> Description Used Size Hours Cost <br /> O 1 a Rip Compacted areas RIPPER 1 9.52 $2,490 <br /> 02a Transport and apply topsoil SCRAPERI 1 18.33 $14,896 <br /> 03a Reveg Riparian Areas REVEGE 1 3.00 $1,031 <br /> 03b Reveg Upland Areas REVEGE 1 10.00 $6,447 <br /> 04a Initial Mobilization MOBILIZE 1 4.28 $4,224 <br /> 04b Secondary Mobilization MOBILIZE 1 4.28 $916 <br /> SUBTOTALS: 49.41 $30,004 <br /> INDIRECT COSTS <br /> OVERHEAD AND PROFIT: <br /> Liability insurance: 2.02 Total= $606 <br /> Performance bond: 1.05 Total= $315 <br /> Job superintendent: 24.71 Total= $1,780 <br /> Profit: 10.00 Total= $3,000 <br /> TOTAL 0&P= $5,701 <br /> CONTRACT AMOUNT(direct+0&P)= $35,705 <br /> LEGAL-ENGINEERING-PROJECT MANAGEMENT: <br /> Financial warranty processing(legal/related costs): $500 Total= $500 <br /> Engineering work and/or contract/bid preparation: 4.25 Total= $1,517 <br /> Reclamation management and/or administration: 5.00 $1,785 <br /> CONTINGENCY: 3.00 Total= $900 <br /> TOTAL INDIRECT COST= $10,404 <br /> TOTAL BOND AMOUNT(direct+indirect)= $40,408 <br />
The URL can be used to link to this page
Your browser does not support the video tag.