Laserfiche WebLink
Table of Contents <br /> 1. Purpose.....................................................................................................................................1 <br /> 2. Tailings Acceptance from the Mill........................................................................................... 2 <br /> 3. Mixing Waste Rock with Tailings for Proper Compaction......................................................4 <br /> 4. Procedures for Attaining Proper Compaction of Tailings and Waste Rock.............................1 <br /> 5. Measuring and Documenting Proper Compaction of Tailings and Waste Rock..................... 2 <br /> 6. Dealing with Frozen Conditions on Site and Temporary Tailings/Waste Rock Storage........4 <br /> 7. Permanent Pile Configuration and Construction.................................................................... 5 <br /> 8. Topsoiling and Revegetation of the Permanent Embankments ..............................................7 <br /> Appendices......................................................................................................................................9 <br /> Appendix A— CTL Thompson Test Results <br /> Appendix B —Troxler Nuclear Gauge Manual <br /> Appendix C — Moisture Meter Manual and Procedures <br /> Appendix D — Revenue and Atlas Pile Design Details <br /> Appendix E —Test Record Sheets of-Mill Tailings Test Sheets of pH and <br /> Moisture and-Compaction Density/Moisture Tests at Piles <br /> ii <br />