Laserfiche WebLink
1 . Purpose <br /> The purpose of this report is to provide a guidance manual for the removal,handling,and <br /> permanent placement of tailings and waste rock for the Revenue mine operation. It is <br /> important that proper procedures be followed in various steps in the process: <br /> a) accepting tailings from the mill based on moisture content and pH <br /> b) mixing waste rock with tailings in proper portions for compaction <br /> c) procedures for attaining proper compaction of the tailings and waste rock <br /> d) measuring and documenting compaction of the tailings and waste rock dealing <br /> with frozen conditions on site and temporary tailings storage <br /> e) dealing with the avalanche path in the Revenue waste pile <br /> f) permanent pile configuration, including slopes, benches, drainage ditches and <br /> diversions <br /> g) topsoiling and revegetation of the permanent embankment <br /> 1 <br />