My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-12-07_REVISION - M2012032 (7)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2012032
>
2021-12-07_REVISION - M2012032 (7)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2021 11:13:15 AM
Creation date
12/7/2021 10:52:17 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2012032
IBM Index Class Name
Revision
Doc Date
12/7/2021
Doc Name Note
Exhibit L: Reclamation Costs
Doc Name
Proposed Revision Materials
From
Ouray Silver Mines, Inc
To
DRMS
Type & Sequence
AM2
Email Name
LJW
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Truck/Loader Worksheet Cont'd Task#05C Page 2 of 3 <br /> Truck Bed(volume)Basis: <br /> Struck Volume: 15.00 LCY <br /> Heaped Volume: 18.00 LCY <br /> Average Volume: 16.50 LCY <br /> Adjusted Volume: 18.00 LCY <br /> Final Truck Volume Based on Number of Loader Passes: 16.50 LCY <br /> Loading Tool Capacity <br /> Bucket Size Class: NA <br /> Rated Capacity: 5.000 LCY(heaped) <br /> Bucket Fill Factor: 0.825 Blasted rock-avg.blasted (75-90%)0.825 <br /> Adjusted Capacity: 4.125 LCY <br /> Job Condition Corrections: Site Altitude(ft.): 10650 feet <br /> Truck Loader Source <br /> Altitude Adj: 0.890 1.000 (CAT HB) <br /> Job Efficiency: 0.830 0.830 (CAT HB) <br /> Net Correction: 0.739 0.830 <br /> Loading Tool Cycle Time: Number of Loading Tool Passes Required to Fill Truck: 4 passes <br /> Excavators and Front Shovels: <br /> Machine Cycle Time vs.Job Condition Rating: NA <br /> Selected Value within this Basic Rating: NA <br /> Track Loaders—Material Description: <br /> Cycle Time Elements(min.): <br /> Load: NA Maneuver: NA Dump: 0.100 <br /> Wheel and Track Loaders-Unadjusted Basic Loader Cycle Time(load,dump,maneuver): 0.500 minutes <br /> Cycle Time Factors Factor(min.) Source <br /> Material: Material 3/4"to 6"diameter 0.00 0.000 (Cat HB) <br /> Stockpile: Conveyor or dozer piled 10 ft.high and up 0.00 0.000 (Cat HB) <br /> Truck Ownership: Common ownership of trucks and loaders-0.04 -0.040 (Cat HB) <br /> Operation: I Constant operation-0.04 -0.040 1 (Cat HB) <br /> Dump Target: I Nominal target 0.00 0.000 (Cat HB) <br /> Net Cycle Time Adjustment: -0.080 minutes <br /> Adjusted Loader Cycle Time: 0.420 minutes <br /> Net Load Time per Truck: 1.360 minutes <br /> Truck Cycle Time: <br /> Truck Exchange Time: 0.50 Minutes Adjusted for site altitude: 0.562 Minutes <br /> Truck Load Time: 1.360 Minutes Adjusted for site altitude: 1.360 Minutes <br /> Truck Maneuver and Dump Time: 0.90 Minutes Adjusted for site altitude: 1.011 Minutes <br /> Truck Travel(Haul&Return)Time: Road Condition:Rutted dirt,little maintenance,no water, 1"tire <br /> penetration 4.0 <br /> CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.