Laserfiche WebLink
Truck/Loader Worksheet Cont'd Task#05C Page 3 of 3 <br /> Haul Route: <br /> Seg# Haul Distance Grade(%) Roll.Res Total Res Velocity Travel <br /> (Ft) (%) (%) (fpm) Time <br /> min <br /> 1 3500.00 2.00 4.00 6.00 1477 2.417 <br /> Haul Time: 2.417 minutes <br /> Return Route: <br /> Seg# Haul Distance Grade(%) Roll.Res Total Res Velocity Travel <br /> (Ft) (%) (%) (fpm) Time <br /> min <br /> 1 3500.00 -2.00 4.00 2.00 2960 1.217 <br /> Return Time: 1.217 minutes <br /> Total Truck Cycle Time: 6.567 minutes <br /> Loading Tool unit <br /> Production 515.14 LCY/Hour Adjusted for job efficiency: 427.57 LCY/Hour <br /> Truck Unit Production <br /> 150.75 LCY/Hour Adjusted for job efficiency: 125.12 LCY/Hour <br /> Optimal No.of Trucks: 3 Truck(s) Selected Number of Trucks: 3 Truck(s) <br /> Adjusted hourly truck team production: 375.37 LCY/Hour <br /> Adjusted single truck/loader team production: 375.37 LCY/Hour <br /> Adjusted multiple truck/loader team production: 375.37 LCY/Hour <br /> JOB TIME AND COST <br /> Fleet size: 1 Team(s) Total job time: 17.02 Hours <br /> Unit cost: $1.364 /LCY Totaljobcost: $8,715 <br /> CIRCES Cost Estimating Software <br />