My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-12-07_REVISION - M2012032 (7)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2012032
>
2021-12-07_REVISION - M2012032 (7)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2021 11:13:15 AM
Creation date
12/7/2021 10:52:17 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2012032
IBM Index Class Name
Revision
Doc Date
12/7/2021
Doc Name Note
Exhibit L: Reclamation Costs
Doc Name
Proposed Revision Materials
From
Ouray Silver Mines, Inc
To
DRMS
Type & Sequence
AM2
Email Name
LJW
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 of 3 <br /> TRUCK/LOADER TEAM WORK <br /> Task description: Transport caprock for Atlas TSF <br /> Site: Revenue Mine Permit Action: TR-16 Permit/Job#: M2012032 <br /> PROJECT IDENTIFICATION <br /> Task#: 05C State: Colorado Abbreviation: None <br /> Date: 9/2/2021 County: Ouray Filename: M032-05c <br /> User: ACY <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COST Shift basis: 1 per day <br /> Equipment Description <br /> Truck Loader Team-Truck: Generic 15-18 cy,6x4 <br /> -Loader: CAT 966H <br /> Support Equipment-Load Area: NA <br /> -Dump Area: NA <br /> Road Maintenance—Motor Grader: NA <br /> -Water Truck: NA <br /> Cost Breakdown: Truck/Loader Team Support Equipment Maintenance Equipment <br /> Truck Loader Load Area Dump Area Motor Grader Water Truck <br /> %Utilization-machine: 100 100 NA NA NA NA <br /> Ownership cost/hour: $33.16 $59.72 NA NA NA NA <br /> Operating cost/hour: $53.10 $55.20 NA NA NA NA <br /> %Utilization-riper: NA 0 NA NA NA NA <br /> Ripper own.cost/hour: NA $0.00 NA NA NA NA <br /> Ripper op.cost/hour: NA $0.00 NA NA NA NA <br /> Operator cost/hour: $32.54 $40.71 NA NA NA NA <br /> Unit Subtotals: $118.80 $155.63 NA NA NA NA <br /> Number of Units: 3 1 0 0 0 0 <br /> Group Subtotals: Work: $512.03 Support: $0.00 Maint: $0.00 <br /> Total work team cost/hour: $512.03 <br /> MATERIAL QUANTITIES <br /> Initial volume: 6,389 CCY Swell factor: 1.000 <br /> Loose volume: 6,389 LCY <br /> Source of estimated volume: 3.96 ac @ 1 It thick <br /> Source of estimated swell factor: Cat Handbook <br /> Material Purchase Cost: $0.00 <br /> Total Cost: $0.00 <br /> HOURLY PRODUCTION <br /> Truck Capacity <br /> Truck Payload(weight)Basis: <br /> Material weight: 2,950 Pounds/LCY <br /> Description: Traprock-broken <br /> Rated Payload: 63,980 Pounds <br /> Payload Capacity: 21.69 LCY <br /> CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.