My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-11-03_REVISION - M1994097
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1994097
>
2021-11-03_REVISION - M1994097
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2024 3:34:36 PM
Creation date
11/4/2021 9:45:19 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1994097
IBM Index Class Name
REVISION
Doc Date
11/3/2021
Doc Name
Request for Technical Revision
From
Oldcastle SW Group Inc. dba United Companies of Mesa County
To
DRMS
Type & Sequence
TR5
Email Name
MAC
THM
AWA
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Topsoil and overburden will be directly placed via trucks and loaders. Berms will be flattened and <br /> ponds will be filled using dozers. Components, areas, and volumes that make up the worst-case <br /> reclamation scenario in each phase are described below: <br /> Phase 1 — Existing Disturbance (62 acres): <br /> 1. Backfill and grade 500 feet of highwall (approx. 30 ft tall)to the final contours <br /> a. 10,703 CY of backfill directly placed via loader and haul truck from overburden <br /> stockpiled in old mining area <br /> 2. Place topsoil across all areas that are not partially reclaimed <br /> a. Place topsoil on all 51 acres at 12 inches deep= 82,263 CY <br /> 3. Remove scale and office <br /> 4. Seed entire disturbance area <br /> a. 62 acres total to be seeded, assume 25% seed failure (applied to area in calculating <br /> estimated costs) <br /> 5. Mulch all seeded areas <br /> Phase 2— Northern Disturbance (25 acres): <br /> 1. Place topsoil across all disturbed areas <br /> a. Place topsoil on all 25 acres at 12 inches deep=40,325 CY <br /> b. Remove scale and office <br /> 2. Seed all retopsoiled areas <br /> a. 25 acres total to be seeded, assume 25% seed failure (applied to area in calculating <br /> estimated costs) <br /> 3. Mulch all seeded areas <br /> Spring Creek Pit <br /> September 2021 L-g Lewicki St Associates <br />