Topsoil and overburden will be directly placed via trucks and loaders. Berms will be flattened and <br /> ponds will be filled using dozers. Components, areas, and volumes that make up the worst-case <br /> reclamation scenario in each phase are described below: <br /> Phase 1 — Existing Disturbance (62 acres): <br /> 1. Backfill and grade 500 feet of highwall (approx. 30 ft tall)to the final contours <br /> a. 10,703 CY of backfill directly placed via loader and haul truck from overburden <br /> stockpiled in old mining area <br /> 2. Place topsoil across all areas that are not partially reclaimed <br /> a. Place topsoil on all 51 acres at 12 inches deep= 82,263 CY <br /> 3. Remove scale and office <br /> 4. Seed entire disturbance area <br /> a. 62 acres total to be seeded, assume 25% seed failure (applied to area in calculating <br /> estimated costs) <br /> 5. Mulch all seeded areas <br /> Phase 2— Northern Disturbance (25 acres): <br /> 1. Place topsoil across all disturbed areas <br /> a. Place topsoil on all 25 acres at 12 inches deep=40,325 CY <br /> b. Remove scale and office <br /> 2. Seed all retopsoiled areas <br /> a. 25 acres total to be seeded, assume 25% seed failure (applied to area in calculating <br /> estimated costs) <br /> 3. Mulch all seeded areas <br /> Spring Creek Pit <br /> September 2021 L-g Lewicki St Associates <br />