Laserfiche WebLink
Backfill and grade <br /> 500'of typical ? <br /> highwall <br /> Phase 2 <br /> Reclamation <br /> (25 acres) <br /> Requires topsoil, <br /> hing. <br /> w1willow" Muffill <br /> � seeding and mulc <br /> 'fir//��i Reclamation <br /> 11 acres backfilled,graded,and r r Qii, (62 acres) <br /> topsoiled as of 2021. <br /> Seeding and mulching still required <br /> Backfill and grade <br /> 500'of typical <br /> highwall <br /> Total <br /> Disturbance <br /> (87 acres) <br /> Figure L-1. Reclamation Plan <br /> Spring Creek Pit L_2 Lewicki&Associates <br /> September 2021 <br />