Laserfiche WebLink
Table L-1 —Reclamation Cost Estimate Phase 1 <br /> Activity Description Time Quantity Unit C• Cost <br /> Bach'M"and made 'of 0.5 <br /> ft.tall 8,333 CY $1".50 $12,500 <br /> Remove scale and office 0.1 ' <br /> trailer 1 $1,000.00 $1,000 <br /> Topl-all disturbed . 0.6 <br /> areas to be rev tamed. 82,263 CY $1.50 $123,395 , <br /> Drill seed all topsoiled 1 0.5 ` 77.5 acres $476.00 $36,890 <br /> areas (rangeland mix <br /> Mulch a[t,seaeded'are 0.5 77,5 acres $858.00--" <br /> Totals 1.5 $240,279 <br /> DRMS Costs(28%x <br /> direct costs) $67;278 i <br /> Phase 1 Bond Amount $307,557 <br /> Table L-2 Reclamation Cost Estimate Phase 2 <br /> Activity Description Time Quantity <br /> Topsoil 0 d"wbed„ 0:5° " <br /> 40;325 CY. $1,50 $w,4 j <br /> areas,to be re <br /> Drill seed all topsoiled ( 0.5 <br /> areas ran eland mix 31.25 acres ; $476.00 $14,875 <br /> Mulch all seedW' i , '` ` : 31.25 acres - $858.00 <br /> Totals 1.0 $102,175 <br /> DRMS Costs tom."x.: <br /> direct costs <br /> Phase 2 Bond Amount $130,784 <br /> Spring Creek Pit L_4 ®Lewicki&Associates <br /> September 2021 <br />