My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-10-29_PERMIT FILE - M2021064 (6)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2021064
>
2021-10-29_PERMIT FILE - M2021064 (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2025 2:39:38 AM
Creation date
11/1/2021 1:04:20 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2021064
IBM Index Class Name
Permit File
Doc Date
10/29/2021
Doc Name
Application
From
C & J Gravel Products, Inc
To
DRMS
Email Name
LJW
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The project-generated trips as calculated in item 6 above were then assigned within the <br /> study area based on the trip distributions calculated in items 7 above (Exhibits A and B); <br /> there are no trips anticipated to be assigned within the study area. <br /> No figure is provided. <br /> 9. Existing and Projected Traffic Volumes <br /> Figure WA-5.Table of traffic volumes <br /> Avera a Annual Da ly Traffic AADT Count 2020 <br /> Route Ref Pt End L(mi) AA DT Year A B % C D Point Description <br /> trucks <br /> 160 104824 Na Na 14000 2020 350 360 5.07% NA NA East of CR-600 m 140.8 <br /> 160 104823 Na Na 8700 2020 170 380 6.32% NA NA West of CR-600 m 139.2 <br /> CR600 Na Na 5300 2020 180 20 <4% NA NA At SH-160 m 140.872 <br /> A:AADT Single Trucks. B:AADT Comb Trucks C:Design Hour Volume percentage of AADT D:Daily Vehicle Miles Traveled. <br /> Average Annual Daily Traffic AADT Count antici ated 2030 5%per ear <br /> Route Ref Pt End L(mi) AA DT Year A B % C D Seg Description <br /> trucks <br /> 160 104824 Na Na 14700 2030 368 378 5.1% NA NA Approx MP 140.8 <br /> 160 104823 Na Na 9135 2030 179 409 6.3% NA NA A rox MP 139.2 <br /> CR600 Na Na 5300 2020 180 20 <4% NA NA At SH-160 m 140.872 <br /> Ave rage Annual DailyTraffic AADT Count anticipate 2040 5%per year <br /> Route Ref Pt End L(mi) AA DT Year A B % C D Seg Description <br /> trucks <br /> 160 104824 Na Na 15400 2040 385 396 5.1% NA NA Approx MP 140.8 <br /> 160 104823 Na Na 9570 2040 187 418 6.3% NA NA A rox MP 139.2 <br /> CR600 Na Na 5300 2020 180 20 <4% NA NA At SH-160 m 140.872 <br /> Based on the main generators of traffic in the segment of SH-160, with major commercial, tourist, <br /> residential and institutional generators, it is a reasonable assumption that the large volume of <br /> traffic dwarfs and will continue to dwarf traffic from the Oakbrush Hill operations. Actual traffic <br /> generators are assumed to have 25% of ADT during peak hour, as it is located in a typical small <br /> urban setting and matches typical percentages of AADT during peak hour. <br /> a. Existing total average daily traffic (ADT)volumes and existing AM and PM peak hour <br /> turning movement volumes for the street system in the study area. Include all turning <br /> movements. <br /> b. Projected total daily traffic volumes and projected AM and PM peak hour traffic volumes, <br /> including existing (background) plus generator traffic, for the street system in the study <br /> area. Include all turning movements. <br /> c. Future projected "background" traffic volumes (volumes already using the roadway <br /> system without the proposed development)for daily, and AM and PM peak hour traffic <br /> volumes. Include all turning movements. <br /> d. Total projected daily traffic volumes and AM and PM peak hour traffic volumes, including <br /> existing traffic, generator traffic and cumulative traffic from build-out of approved <br /> projects. If the proposed development is being proposed in phases it may be appropriate <br /> to evaluate each major phase. Include all turning movements. <br /> e. Total and peak hour daily and turning movement volumes for"horizon" study year which <br /> is generally the 20th year projection. The peak hour traffic volume estimates for any <br /> access shall be based upon the anticipated total build-out of the development to be <br /> served, and shall include the highest peak hour volume within the entire day for each <br /> turning movement, which is typically the peak hour of the generator. See Section <br /> 2.3(4)(e) of the State Highway Access Code for information on calculating passenger car <br /> equivalents. <br /> C&J Gravel Products, Inc. Page 71 of 93 20 OCT 2021 <br /> Application for Permit: Oakbrush Hill Gravel M-2021- C&J-DPR-V5-001 <br />
The URL can be used to link to this page
Your browser does not support the video tag.