Laserfiche WebLink
5 October 2021 C-1981-010/Trapper Mine RAR <br /> Various levels of benches exist in the N Pit from west to east. The N Pit floor is exposed on the west end <br /> of the Pit. The coal level(Q seam),has been reached at the west end of the N Pit. Coal was being loaded <br /> and hauled. Overburden was being excavated and hauled from the east end of the pit at the time of <br /> inspection. There are several seeps along the south and east walls of the pit. The Queen Anne dragline <br /> was idle in N Pit at the time of inspection. Roads being watered in N Pit at the time of inspection. <br /> Pond dredging was underway in the East Pyeatt Pond. <br /> During the review of the vegetation data prior to the inspection, the vegetation sampling was found to <br /> be in compliance with Rule 4.15.11(1) and the permit application. <br /> INSPECTION Phase III. <br /> Phase III Parcels <br /> AB09 AB10 FA10 FA11 <br /> FAB09 KA10 KAII ZA10 <br /> Selection Statistics of Reclamation_Parcels_Seneca_wkng X <br /> POW <br /> RPT_ACRE <br /> Frequency Distribution <br /> Statistics: <br /> Count: 14 $ <br /> Minimum: 1.2 <br /> Maximum:83.5 S <br /> Sum: 266.7 <br /> Mean: 19.45 4 <br /> Standard Deviation.22.957748 <br /> Nulls: 4 2 <br /> 0 <br /> 1.2 26.5 51 b, 77.0 <br /> L <br /> Table 1: DRMS acreage calculation for parcels requested comprising bond release SL23. <br /> The application requested 265.5acres of phase III bond release. DRMS's GIS indicates an acreage of <br /> 266.7 acres. The difference between the two values is due to: <br /> o DRMS does not track redisturbance in the reclamation parcel dataset. <br /> o Accuracy and precision in digitizing parcels from scanned maps. <br /> Number of Partial Inspection this Fiscal Year: 4 <br /> Number of Complete Inspections this Fiscal Year: 2 <br />