My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-09-17_PERMIT FILE - M2021058
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2021058
>
2021-09-17_PERMIT FILE - M2021058
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2025 7:53:05 AM
Creation date
9/19/2021 9:20:07 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2021058
IBM Index Class Name
Permit File
Doc Date
9/17/2021
Doc Name
Incompleteness Response
From
Union Milling Contractors
To
DRMS
Email Name
DMC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Stormwater Management Plan <br /> b. Management of contaminated soils <br /> If chemical or petroleum spills occur„the contaminated material will be removed,drum <br /> or bagged and remove. Acid or toxic producing materials or spills will be made within 24 <br /> hours of occurrence and arrangements to dispose the materials in an approved facilities <br /> within 30 days of the occurrence will be arranged. <br /> c. Loading and unloading_operations <br /> Loading and unloading of liquids and solids during site operation will be conducted <br /> under the supervision of CJK Aggregate's manager or designated personnel. <br /> d. Equipment maintenance and fueling <br /> Fuels and lubricants will be appropriately stored in secondary containments structures <br /> when the volume exceeds 55 gallons. <br /> e. Workingareas <br /> reas <br /> Control measures including emergency response and spill containment kits will be made <br /> available in convenient locations to control spills. <br /> f. Maintenance activities involving fertilizers, pesticides, detergents, fuels, solvents, oils, <br /> etc. will be employed. <br /> Use of chemicals will be conducted in accordance with manufactures recommendations <br /> and the approval of DRMS,and in accordance with County regulations. Most of the <br /> maintenance activities will be related to fueling equipment and the application of <br /> herbicides/pesticides. The use of herbicides/pesticides will be conducted in accordance <br /> with CJK's Weed Control Management Plan. <br /> g. On-site waste management practices <br /> Generated solid waste will be hauled off site and disposed in a licensed sanitary landfill. <br /> Hazardous substances including used oil,tires, solvents, paints etc.will be hauled offsite <br /> and disposed in accordance with State and County waste management criteria. <br /> h. Concrete truck/equipment washing including the concrete truck chute <br /> and associated fixtures and equipment. <br /> Concrete trucks operators(if used on site) will not be permitted to wash their equipment <br /> on site. <br /> i. Dedicated asphalt and concrete batch plants <br /> No asphalt or concrete batch plants are planned to be constructed. <br /> CJK SPECIALITY AGGREGATES <br /> CIK Milling Company,LLC <br /> Leadville,Colorado <br /> Page 8 of 32 <br />
The URL can be used to link to this page
Your browser does not support the video tag.