My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-09-17_PERMIT FILE - M2021058
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2021058
>
2021-09-17_PERMIT FILE - M2021058
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2025 7:53:05 AM
Creation date
9/19/2021 9:20:07 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2021058
IBM Index Class Name
Permit File
Doc Date
9/17/2021
Doc Name
Incompleteness Response
From
Union Milling Contractors
To
DRMS
Email Name
DMC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Stormwater Management Plan <br /> BEST MANAGEMENT PRACTICES, MONITORING, INSPECTION AND <br /> MAINTENANCE <br /> EROSION CONTROAL MEASURE(ECM) <br /> 1. ECMs will be implemented to manage stormwater and to prevent sediment <br /> from entering the waters of the State at the following locations, <br /> a. access roads <br /> b. aboveground storage tank(AST)fuel storage location, and <br /> C. areas prone to sheet wash erosion <br /> Where appropriate, the following stormwater management controls measures will be utilized <br /> where necessary: (See (Appendix 1--Site Drainage Report.) <br /> 1. Geotextiles, mats, and erosion control blankets, <br /> 2. Wattles (Fiber Rolls), <br /> 3. Check dams, <br /> 4. Berms, <br /> 5. Sediment traps <br /> 6. Rock dams. <br /> 7. Diversion Ditches <br /> 8. Culvert outlet protection and <br /> 9. Vehicle tracking pad(s) <br /> MONITORING <br /> a) ECMs will be inspected once a month and after significant precipitation for the period <br /> between June and September(see Inspection and Maintenance section and Inspection <br /> Reports (appendix 4) for more details). <br /> b) Road water control maintenance will routinely be conducted. <br /> Stormwater Management Controls <br /> 1. Storm Water Management Plan(SWMP)Administration <br /> a. Vehicle tracking water control measures. <br /> Tracking controls will be installed and maintained at the Facility entrance. <br /> z Major site construction activities will be documented(See Appendix 3) <br /> CJK SPECIALITY AGGREGATES <br /> CIK Milling Company,LLC <br /> Leadville,Colorado <br /> Page 7 of 32 <br />
The URL can be used to link to this page
Your browser does not support the video tag.