J&T Consulting, Inc. J-2 Contracting Company <br /> DPG Pit <br /> 2Z 8/20/2021 <br /> Reclamation Bond Quantities and Costs <br /> ©2021 JaT Cousulfim Inc. 18114 DPG Pit TR1 Rec Bond Ca s <br /> Phase 2 -54.21 acres(Mining Limits) <br /> Reclamation Operation Quantity Unit Unit Cost Cost <br /> Slurry Wall for Phase 2 7,840 If $373 $2,924,320 <br /> Scarifying-Above Water Surface to Permit Boundary 11.76 ac $200 $2,352 <br /> Topsoil Placement-Above Water Surface to Permit Boundary 11.76 ac $1,800 $21,168 <br /> Revegetate-Above Water Surface to Permit Boundary 11.76 ac $1,000 $11,760 <br /> Scarifying-Processing and Stockpile Area in Phase 5 Area 20.77 ac $200 $4,154 <br /> Topsoil Placement-Processing and Stockpile Area in Phase 5 Area 20.77 ac $1,800 $37,386 <br /> Revegetate-Processing and Stockpile Area in Phase 5 Area 20.77 ac $1,000 $20,770 <br /> Bedding CDOT Type II 235 cy $84 $19,740 <br /> 6-in D50 Riprap,Type VL 1,037 cy $65 $67,405 <br /> Reinforced Concrete 3,727 cy $100 $372,700 <br /> Embankment Fill 13,114 cy $14 $183,596 <br /> Dewatering of Pit for Phase 2 821.00 mg $400 $328,400 <br /> Credits for Areas Distrurbed During Phase 1 Which Will Be Mined Through <br /> Scarifying-Overburden Area in Phase 2 Area (8.37) ac $200 ($1,674) <br /> Topsoil Placement-Overburden Area in Phase 2 Area (8.37) ac $1,800 ($15,066) <br /> Revegetate-Overburden Area in Phase 2 Area (8.37) ac $1,000 ($8,370) <br /> Scarifying-Slurry Wall Construction Corridor in Phases 2&5 Areas (12.73) ac $200 ($2,546) <br /> Topsoil Placement-Slurry Wall Construction Corridor in Phases 2&5 Areas (12.73) ac $1,800 ($22,914) <br /> Revegetate-Slurry Wall Construction Corridor in Phases 2&5 Areas (12.73) ac $1,000 ($12,730) <br /> Mobilization 1.0 Is $2,500 $2,500 <br /> Total Direct Cost $3,932,951 <br /> Overhead and Profit Cost(12.60%) $495,552 <br /> Contract Cost $4,428,503 <br /> Project Management(9,25%) $409,637 <br /> Additional Financial Warranty Required For Phases 2 $4,838,139 <br /> Cummulative Financial Warranty Required For Phase 1-2 $5,426,609 <br /> Phase 3 - 10.59 acres(Mining Limits) <br /> Reclamation Operation Quantity Unit Unit Cost Cost <br /> Backfll Silt Pond 635,660 cy $1.50 $953,490 <br /> Scarifying-Disturbed Areas-Phase 3 Mining Limits outside stockpile processing area to permit boundary 15.13 ac $200 $3,026 <br /> Topsoil Placement-Disturbed Areas-Phase 3 Mining Limits outside stockpile processing area to permit boundary 15.13 ac $1,800 $27,234 <br /> Revegetate-Disturbed Areas-Phase 3 Mining Limits outside stockpile processing area to permit boundary 15.13 ac $1,000 $15,130 <br /> Mobilization 1.0 Is $2,500 $2,500 <br /> Subtotal Direct Cost $1,001,380 <br /> Remove Backfll Cost from Bond Because DPG Farms, LLC Dedication of Patterson Ditch Shares(Admin Cost Included in Phase 1) 1 Is ($953,490) ($953,490) <br /> Total Direct Cost $47,890 <br /> Overhead and Profit Cost(12.60%) $6,034 <br /> Contract Cost $53,924 <br /> Project Management(9.25%) $4,988 <br /> Additional Financial Warranty Required For Phase 3 $58,912 <br /> Cummulative Financial Warranty Required For Phase 1-3 $5,485,521 <br />