Laserfiche WebLink
J&T Consulting, Inc. J-2 Contracting Company <br /> 2Z <br /> DPG Pit <br /> 8/20/2021 <br /> Reclamation Bond Quantities and Costs <br /> 2 2021 JAT Consialthm Im 18114 DPG PR TR1 Rec Bond Calcs <br /> Phases 1 - 10."acres (Mining Limits) <br /> Reclamation Operation Quantity Unit Unit Cost Cost <br /> Backfill Silt Pond 631,040 cy $2 $946,560 <br /> Scarifying-Phase 1 Area 12.99 ac $200 $2,598 <br /> Topsoil Placement-Phase 1 Area 12.99 ac $1,800 $23,382 <br /> Revegetate-Phase 1 Area 12.99 Be $1,000 $12,990 <br /> Other Disturbed Areas <br /> Scarifying-Freshwater Pond and Dewatering Pipe Area 0.52 ac $200 $104 <br /> Topsoil Placement-Freshwater Pond and Dewatering Pipe Area 0.52 ac $1,800 $936 <br /> Revegetate-Freshwater Pond and Dewatering Pipe Area 0.52 ac $1,000 $520 <br /> Scarifying-Recharge Ponds and Overflow Pond Areas In Phase 4 Area 25.19 ac $200 $5,038 <br /> Topsoil Placement-Recharge Ponds and Overflow Pond Areas In Phase 4 Area 25.19 ac $1,800 $45,342 <br /> Revegetate-Recharge Ponds and Overflow Pond Areas In Phase 4 Area 25.19 ac $1,000 $25,190 <br /> Scarifying-Stockpile,Processing,Road,Parking,Loading,Topsoil Areas in Phase 4 Area 17.71 ac $200 $3,542 <br /> Topsoil Placement-Stockpile,Processing,Road,Parking,Loading,Topsoil Areas in Phase 4 Area 17.71 ac $1,800 $31,878 <br /> Revegetate-Stockpile,Processing,Road,Parking,Loading,Topsoil Areas in Phase 4 Area 17.71 ac $1,000 $17,710 <br /> Scarifying-Overburden Area in Phase 2 Area 8.37 ac $200 $1,674 <br /> Topsoil Placement-Overburden Area in Phase 2 Area 8.37 ac $1,800 $15,066 <br /> Revegetate-Overburden Area in Phase 2 Area 8.37 ac $1,000 $8,370 <br /> Scarifying-Slurry Wall Construction Corridor in Phases 2&5 Areas 12.73 ac $200 $2,546 <br /> Topsoil Placement-Slurry Wall Construction Corridor in Phases 2&5 Areas 12.73 ac $1,800 $22,914 <br /> Revegetate-Slurry Wall Construction Corridor in Phases 2&5 Areas 12.73 ac $1,000 $12,730 <br /> Scarifying-Phase 5 Surface Processing and Product Stockpile Area 22.26 ac $200 $4,452 <br /> Topsoil Placement-Phase 5 Surface Processing and Product Stockpile Area 22.26 ac $1,800 $40,068 <br /> Revegetate-Phase 5 Surface Processing and Product Stockpile Area 22.26 ac $1,000 $22,260 <br /> Scarifying-Access Roads and Scale House Area 2.92 ac $200 $584 <br /> Topsoil Placement-Access Roads and Scale House Area 2.92 ac $1,800 $5,256 <br /> Revegetate-Access Roads and Scale House Area 2.92 ac $1,000 $2,920 <br /> Removal of Foundations for Scale House and Scale 50 cy $200 $10,000 <br /> Removal of Dewatering Overflow Pipe from Overflow Pond to Cache La Poudre River 200 If $6 $1,200 <br /> Removal of Dewatering Pipe from Silt Pond to Recharge Pond 1,100 If $6 $6,600 <br /> Mobilization 1.0 Is $2,500 $2,500 <br /> Subtotal Direct Cost $1,274,930 <br /> Remove Backfill Cost from Bond Because DPG Farms,LLC Dedication of Patterson Ditch Shares 1 Is ($946,560) ($946,560) <br /> Administration Costs DPG Farms,LLC dedication of Patterson Ditch Shares to Change to Augmentation 1 Is $150,000 $150,000 <br /> Total Direct Cost $478,370 <br /> Overhead and Profit Cost(12.60%) $60,275 <br /> Contract Cost $538,645 <br /> Project Management(9.25%) $49,825 <br /> Total Required Financial Warranty For Phase 1 $588,469 <br />