JET Consulting, Inc. J-2 Contracting Company <br /> DPG Pit <br /> In 8/20/2021 <br /> Reclamation Bond Quantities and Costs <br /> ©2021 JAT Consulthm Inc. 18114 DPG Pit TRt Rec Bond Ca <br /> Phase 4-93.03 acres(Mining Limits) <br /> Reclamation Operation Quantity Unit Unit Cost Cost <br /> Slurry Wall for Phase 4 6,765 If $386 $2,611,290 <br /> Scarifying-Above Water Surface to Permit Boundary 12.17 ac $200 $2,434 <br /> Topsoil Placement-Above Water Surface to Permit Boundary 12.17 ac $1,800 $21,906 <br /> Revegetate-Above Water Surface to Permit Boundary 12.17 ac $1,000 $12,170 <br /> Bedding CDOT Type II 1,044 cy $84 $87,696 <br /> 6-in D50 Riprap,Type VL 4,155 cy $65 $270,075 <br /> Reinforced Concrete 6,267 cy $100 $626,700 <br /> Embankment Fill 24,056 cy $14 $336,784 <br /> Dewatering of Pit for Phase 4 1,897.00 mg $400 $758,800 <br /> Credits for Areas distrurbed During Phase 1 Which Will Be Mined Through <br /> Scarifying-Clearwater Pond and Dewatering Pipe Area (0.52) ac $200 ($104) <br /> Topsoil Placement-Clearwater Pond and Dewatering Pipe Area (0.52) ac $1,800 ($936) <br /> Revegetate-Clearwater Pond and Dewatering Pipe Area (0.52) ac $1,000 ($520) <br /> Scarifying-Recharge Ponds and Overflow Pond Areas In Phase 4 Area (25.19) ac $200 ($5,038) <br /> Topsoil Placement-Recharge Ponds and Overflow Pond Areas In Phase 4 Area (25.19) ac $1,800 ($45,342) <br /> Revegetate-Recharge Ponds and Overflow Pond Areas In Phase 4 Area (25.19) ac $1,000 ($25,190) <br /> Scarifying-Stockpile,Processing,Road, Parking,Loading,Topsoil Areas in Phase 4 Area (17.71) ac $200 ($3,542) <br /> Topsoil Placement-Stockpile,Processing,Road,Parking, Loading,Topsoil Areas in Phase 4 Area (17.71) ac $1,800 ($31,878) <br /> Revegetate-Stockpile,Processing,Road, Parking,Loading,Topsoil Areas in Phase 4 Area (17.71) ac $1,000 ($17,710) <br /> Mobilization 1.0 Is $2,500 $2,500 <br /> Total Direct Cost $4,600,095 <br /> Overhead and Profit Cost(12.60%) $579,612 <br /> Contract Cost $5,179,707 <br /> Project Management(9.25%) $479,123 <br /> Additional Financial Warranty Required For Phase 4 $5,658,830 <br /> Cummulative Financial Warranty Required For Phase 1-4 $11,144,351 <br /> Phase 5 - 19.39 acres(Mining Limits) <br /> Reclamation Operation Quantity Unit Unit Cost Cost <br /> Scarifying-Above Water Surface to Permit Boundary 3.85 ac $200 $770 <br /> Topsoil Placement-Above Water Surface to Permit Boundary 3.85 ac $1,800 $6,930 <br /> Revegetate-Above Water Surface to Permit Boundary 3.85 ac $1,000 $3,850 <br /> Embankment Fill 9,948 cy $14 $139,272 <br /> Dewatering of Pit for Phase 5 403.00 mg $400 $161,200 <br /> Mobilization 1.0 Is $2,500 $2,500 <br /> Total Direct Cost $314,522 <br /> Overhead and Profit Cost(12.60%) $39,630 <br /> Contract Cost $354,152 <br /> Project Management(9.25%) $32,759 <br /> Additional Financial Warranty Required For Phase 5 $386,911 <br /> Cummulative Financial Warranty Required For Phase 1-5 $11,531,261 <br />