Laserfiche WebLink
O Rat Srt L ER MASS <br /> �. Please describe the reclamation measures required for the concrete footers used to support the steel <br /> buildings. <br /> Response The urea ctr-otnul the footers will he dng down aizcl the concrete will he rerttoved tit least 1 foot <br /> Mow final gr-crde. Once the conrrctc bevy heett rc morsel the holes gill he huckfillccl to grads <br /> 6. Describe ho\s the footprint of the Equipment Storage Sheds sill be reclaimed. (i.e. ripped, topsoil, <br /> reve(yetation) <br /> Response. The footprint of this building it-II/he grcrclecl to he level The bidldiitg is located it ithing the <br /> polr'gott to he left fin.connnercial use us approved itt IR-11. The area will not recenve topsoil or <br /> reVegetatioit. <br /> Security Building <br /> 7. Describe ho\\ the footprint for this building will be reclaimed. (i.e. ripped, topsoil, reve-etation) <br /> Rcspons•e Please see response to comment 1h above. <br /> Temporary Office Buildings <br /> 8. Describe how the footprint for these buildings be reclaimed. (i.e. ripped, topsoil, revegetation) <br /> Response Pleuse see resI ntse to conuneut t�6 above. <br /> Equipment Wash Area <br /> 9. The Equipment Wash Area is not located on the map F-1, please revise the map to include this <br /> feature. <br /> Response. Please see rerisccl inap F-1 The Equipmcitl it u.ch AI-ca will he locatccl nett to the cast portal <br /> of the ill tclergro tit it/shop. <br /> 10. It is understood that the as-built drassings \\ill be submitted upon completion of the\\ash area. Please <br /> provide dra\\ings and designs shos\ing the size, location and construction details of the Nash pad. <br /> Response• Please see the that shows the design curd clintensions of the vehicle iras pacl. <br /> 11. What is the sump capacit\ of the Equipment Wash Area'? <br /> Response: The s limp it ill he 3'v 3' v 3'and Li ill hole!rough!! 00 gallons There frill he a submersible <br /> ptnnp placed ill the szattp critd conincted to cltt oil water separator that cull pump 5 gallons a ininute. <br /> 12. Please provide details of the oilissater separator that is being proposed for use in the Equipment Wash <br /> Area. Details should include technical specifications and efficiency information to demonstrate that <br /> slash slater«ill be free of h\drocarbons prior to introduction to the passise slater treatment system. <br /> Response• Please see the attached technical infnrrttcrtroll sheet critd manrtal for the oil water separator <br /> The oil hater separator is to handle ;gpnt The slttchc that is generated hr the sepai-crtnr will he <br /> stored oil secoricicna•corituirtnicitt to he properly charctcteri ecl and will he disposed of ill crccordattce With <br /> u crste regulations <br /> 13. During the reclamation of the Equipment Wash Area please specify sshere the concrete rubble from <br /> removing the \sash pad s\ill be placed'? <br /> 2 <br />