My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-08-19_REVISION - M2012032 (2)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2012032
>
2021-08-19_REVISION - M2012032 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2025 6:48:12 AM
Creation date
8/23/2021 5:31:34 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2012032
IBM Index Class Name
REVISION
Doc Date
8/19/2021
Doc Name
Adequacy Review Response
From
Ouray Silver Mines
To
DRMS
Type & Sequence
TR16
Email Name
LJW
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ouray Silver Mines, Inc. <br /> 1900 Main St. Unit l <br /> PO Box 564 <br /> Ouray, CO 81427 <br /> To: Colorado Division of Reclamation. %-tining, & Safety OR-A� Sin ER A/ljNEs <br /> I313 Sherman St. Rm. 21 <br /> Denver. CO 80203 <br /> ALl"ust 17, 2021 AUG 19 2021 <br /> =MrWest <br /> DIVISION OF RECLAMATION <br /> MINING AND SAFETY <br /> OUraN Silver Mines Inc. (OSMI) received the PreliminarN Adequacy Revievb for Technical Revision 16 to <br /> Permit M2012-032 for the Revenue-Virginias Mine(Mine). The Adequac} Review raised 18 major <br /> points, each o vv is i are addressed in italics under headings that repeat the DRMS point of clarification. <br /> A list of tables and attachments added to this Adequacy Review Response is found below <br /> Table 1. <br /> Fable 2. <br /> Equipment Wash Area Drawing <br /> Map F-I <br /> Oil/Water Separator Technical Infonnation <br /> SPCC Plan <br /> Equipment Storalle Sheds <br /> 1. Provide the estimated volume of material generated from dismantling the buildings? <br /> Reslx)11se: It is estilnulecl thus ouch of the equilmlent storage huilclingc frill generotte uI)I)l,oximutrh'3,800 <br /> cubic legit of material. <br /> 2. Is adequate room available to place the additional material underground:' Provide a balance sheet of <br /> the v olume of underground space utilized for onsite disposal and the estimated space each building that is <br /> slated to go underground will take up. Please note that the area designated for onsite disposal in the <br /> underground working must be drv,and awav from the influence of water. <br /> Re.V)onsc>. !ohnnes of aruiluhle ululergrotlncl Sl)uce enrrl)urccl to the c stilnatecl ro111n1c of sl)uce for such <br /> hutllcllllg that 1S Slated to go 1110cl'gl'oun(II)oSt reC'Ic1117at1011 C'(117 he f nincl in Table I aml Table 2. The <br /> majorltl•of(leconstl'1tc'tecl hltihling'' will he Ina into the_`Till Portal with some matcrlal going into the <br /> ill 1clef-giw11T1c1 s'hol). No bllllclings will he lVac'ecl in the Rel't'1111e Poi-tut whel'e thel•woult'l he w0cl-the <br /> influence of wuter. <br /> 3. Please designate which portal will the sheds be placed in'? <br /> Rcsl)ortse. Both the storcl,ZC u'cwehouse,' will be lVace cl into the milll)orrtul <br /> 4. What are the total anticipated job hours associated with dismantling each shed prior to moving it <br /> underground? <br /> Resllonl e. C'ollcem,ativcly, it is e Ctimalecl that -50-mun 170111-S Will be 11ecclecl to clil'l)lUlltic U SilWIc storage <br /> u•(trehouse 1500 hours will he llee(lecl to clismantle both l)ro1)oseel storage irurellollses <br /> Phone:(970)325-9830 ♦ Fax:(970)325-9824 <br />
The URL can be used to link to this page
Your browser does not support the video tag.