My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-08-19_REVISION - M2012032 (2)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2012032
>
2021-08-19_REVISION - M2012032 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2025 6:48:12 AM
Creation date
8/23/2021 5:31:34 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2012032
IBM Index Class Name
REVISION
Doc Date
8/19/2021
Doc Name
Adequacy Review Response
From
Ouray Silver Mines
To
DRMS
Type & Sequence
TR16
Email Name
LJW
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UR-A) -Litt t t K-1 fi.ES <br /> Response: Concrete i-zthhle that is generated while removing the Ecluipnnnt 64 ush At-ea will he placed <br /> It/iclergroLttld ill the.hill Portal <br /> Generator Station and Fuel Tank <br /> 1=4. It is noted that the two Generator Stations will be left on their respective trailers while in use, <br /> however no secondary containment structure for the units were described. Please describe what sort of <br /> containment structures \,\ill be used for the two generator units while on site. <br /> Response. The fuel tusks on the generator-units etre clotthle wallecl 1,00-gallon tanks <br /> SPCC <br /> 15. Table 3.1, no secondary contaminant description is listed for Container C-5. Slmilarl), the generators <br /> included under C-9 will have a similar containment structure. <br /> Response: The fuel tusks on ull generators are double walled This has been ttpdutecl on Table 3.1 of the <br /> SPCC Platt. <br /> 16. Table-4.3 of the SPCC plan does not include the new 10,000-gal fuel tank or storage of fuel w ithin <br /> the Generators. It is container C-9 in the SPCC, please update this section of the SPCC. <br /> Response: Section 4.3 of the SPCC plan has been updutecl to inchule C-9: the proposed 10,000-gallon <br /> letel tank and electr-ical generators <br /> 17. Section 4.3.1 1 Should also address the two proposed backup Generators (C-9) <br /> Recpon�e: Sec-bolt-I.2.11 bus hc!ef7 upclatecl to rellec'1 that while the proposecl backup generutoi-v cn•e <br /> mobile, they will only he operctiecl in the proposed location oft the east side of the property. <br /> 18. Section 4.3 is an incomplete list of tanks that have hydrocarbons transferred into it. It Should include <br /> C-ti and C-9. Note that C-8 is listed but not labeled, transfer of reaGents. Please Update this section of the <br /> SPCC for consistency. <br /> Response- Section-1.3 of the SPCCPIurt 11ct.Y heerr ttpdateclln imltrcle C'-3, C'-8, CHOC'-9 <br /> i <br /> , <br /> 9L <br /> Todd Jesse <br /> Environmental Specialist <br /> 3 � <br />
The URL can be used to link to this page
Your browser does not support the video tag.