Laserfiche WebLink
2.4.3.4.1 Power Supply <br /> "There are two potential utility connections that can support the proposed site, both supplied from the Canon <br /> Plant substation.This substation, located beside the old Canon power plant,distributes 13.2 kV, 69 kV,and 115 <br /> kV to the area. Black Hills Energy is the local distribution company in this area,who own the substation and the <br /> transmission and distribution lines. One of the 13.2 kV circuits runs along Temple Canyon Road up to the old <br /> scrap yard.This is designated by Black Hills as South Canon feeder 64021. Beyond this pole runs a single <br /> phase that extends to the cell phone tower. Black Hills proposes that this line from the intersection of Temple <br /> Canyon Rd and Mariposa Rd be re-conducted and extended to the site." <br /> (DRMS regulations relative to Mining Permit applications state that the applicant must provide,"...a statement <br /> identifying which of the following permits, licenses and approvals which are held or will be sought in order to <br /> conduct the proposed mining and reclamation operations:effluent discharge permits,air quality emissions <br /> permits, radioactive source materials licenses,disposal of dredge and fill material(404)permits, permit to <br /> construct a dam,well permits,explosives permits, State Historic Preservation Office clearance, highway access <br /> permits, U.S. Forest Service permits, Bureau of Land Management permits,county zoning and land use <br /> permits,and city zoning and land use permits." <br /> An easement from the BLM,as required by 43CFR2801.9,will be necessary for a transmission line to be <br /> constructed across public lands.43CFR2801.9 states that,"You must have a grant under this part when you <br /> plan to use public lands for systems or facilities over, under,on,or through public lands.These include, but are <br /> not limited to... Systems for generating,transmitting,and distributing electricity."No such permit has been <br /> identified). <br /> 2.4.3.4.4 Communications <br /> "Telephone and internet services will be provided to the site by a local supplier in Canon City. <br /> A leaky feeder-type radio communication system is planned to be installed along with a wired phone system for <br /> on-site communications." <br /> (DRMS regulations relative to Mining Permit applications state that the applicant must provide,"...a statement <br /> identifying which of the following permits, licenses and approvals which are held or will be sought in order to <br /> conduct the proposed mining and reclamation operations:effluent discharge permits,air quality emissions <br /> permits, radioactive source materials licenses,disposal of dredge and fill material(404)permits, permit to <br /> construct a dam,well permits,explosives permits, State Historic Preservation Office clearance, highway access <br /> permits, U.S. Forest Service permits, Bureau of Land Management permits,county zoning and land use <br /> permits,and city zoning and land use permits." <br /> An easement from the BLM,as required by 43 CFR 2801.9,for a wired telephone line will be necessary prior to <br /> any such construction across public lands.43CFR2809.1 states that,"You must have a grant under this part <br /> when you plan to use public lands for systems or facilities over, under,on or through public lands... these <br /> include, but are not limited to...Systems for transmitting or receiving electronic signals and other means of <br /> communication."No such permit has been identified). <br /> 2.4.3.5. Haul and access roads <br /> "Fugitive dust from roads will be controlled as necessary with water applied by a water truck equipped with <br /> spray bars." <br /> (Who and what will determine necessity?These are important questions to the nearby subdivisions.Will <br /> complaints be necessary to control fugitive dust?To whom are the complaints to be directed?Who will resolve <br /> complaints?) <br /> "The interior haul road will commence at FCR 3,crossing two private properties(approximately 600 ft.)then <br /> proceeding onto the Fremont Placer,owned by Zephyr.The haul road will be <br /> approximately 40 ft.wide including three ft.drainage ditch on each side.The subsurface will be compacted <br /> native soil and surfaced with nine to 12 inches of compacted aggregate or road base.The location of the haul <br /> road at the mine facility may vary during the life of the mine but the haul road from FCR 3 to the mill will be <br /> consistent throughout the life of the mine.The haul road will accommodate hauling and support two-way traffic." <br /> (DRMS regulations relative to Mining Permit applications state that the applicant must provide,"...a statement <br /> identifying which of the following permits, licenses and approvals which are held or will be sought in order to <br />