Laserfiche WebLink
COST SUMMARY WORK <br /> Task Description: Cost Summary for TR-10, Phase 5 —BLM Area 18.5 acres <br /> 2.7 acres pit floor. <br /> PROJECT IDENTIFICATION <br /> Task#: 500 (BLM) 18.5 acres total, 2.7 acres pit floor area <br /> TASK LIST (DIRECT COSTS) <br /> Task Description Form Used Fleet Size Task Hrs Cost <br /> 510 Replace Topsoil over Pit Floor <br /> Phase 5 area—2.7 acres Scraper 1 9.12 $2,754.51 <br /> 520 Rough grade Topsoil Grade 1 1 $114.98 <br /> 530 Rip Phase 5 area—2.7 acres BD 1 4.35 $898.28 <br /> 540 Reseed 2.7 acres + 50% 0 $8,732.04 <br /> 550 Mine Bench Ditch Maintenance BD 1 4.49 $466.65 <br /> 570 Demolition 0 0 <br /> 590 Mob/Demob (no D&B, Ldr., Dozer push) 0 0 <br /> Subtotals 18.96 $12,966.46 <br /> Phase 5(BLM) Direct Cost Total $12,966.46 <br /> INDIRECT COSTS <br /> OVERHEAD AND PROFIT <br /> Liability Insurance 2.02% $261.92 <br /> Performance bond: 1.05% $136.15 <br /> Job Supt 18.96/2 = 9.48 x $65.41= $620.09 <br /> Profit 10% $1,296.65 <br /> Total O & P= $2,314.81 <br /> Contract Amount(direct+O&P) $15,281.27 <br /> LEGAL—ENGINEERING—PROJECT MANAGEMENT: <br /> Financial warranty processing (legal/related costs) 0 <br /> Engineering work and/or contract bid prep 0 <br /> Reclamation management and/or admin: 5% $764.06 <br /> Contingency: 0 <br /> Total Indirect Cost= $3,078.87 <br /> PHASE 5(BLM) TOTAL BOND AMOUNT (direct+indirect) _ $16,045.33 <br /> 19 <br />