My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-08-10_REVISION - M1977193
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977193
>
2021-08-10_REVISION - M1977193
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2024 1:19:44 PM
Creation date
8/11/2021 6:01:49 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977193
IBM Index Class Name
Revision
Doc Date
8/10/2021
Doc Name
Request for Technical Revision
From
Tezak Heavy Equipment
To
DRMS
Type & Sequence
TR10
Email Name
TC1
MAC
AWA
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COST SUMMARY WORK <br /> Task Description: Cost Summary for TR-10, Phase 5 —BLM Area 18.5 acres <br /> 2.7 acres pit floor. <br /> PROJECT IDENTIFICATION <br /> Task#: 500 (BLM) 18.5 acres total, 2.7 acres pit floor area <br /> TASK LIST (DIRECT COSTS) <br /> Task Description Form Used Fleet Size Task Hrs Cost <br /> 510 Replace Topsoil over Pit Floor <br /> Phase 5 area—2.7 acres Scraper 1 9.12 $2,754.51 <br /> 520 Rough grade Topsoil Grade 1 1 $114.98 <br /> 530 Rip Phase 5 area—2.7 acres BD 1 4.35 $898.28 <br /> 540 Reseed 2.7 acres + 50% 0 $8,732.04 <br /> 550 Mine Bench Ditch Maintenance BD 1 4.49 $466.65 <br /> 570 Demolition 0 0 <br /> 590 Mob/Demob (no D&B, Ldr., Dozer push) 0 0 <br /> Subtotals 18.96 $12,966.46 <br /> Phase 5(BLM) Direct Cost Total $12,966.46 <br /> INDIRECT COSTS <br /> OVERHEAD AND PROFIT <br /> Liability Insurance 2.02% $261.92 <br /> Performance bond: 1.05% $136.15 <br /> Job Supt 18.96/2 = 9.48 x $65.41= $620.09 <br /> Profit 10% $1,296.65 <br /> Total O & P= $2,314.81 <br /> Contract Amount(direct+O&P) $15,281.27 <br /> LEGAL—ENGINEERING—PROJECT MANAGEMENT: <br /> Financial warranty processing (legal/related costs) 0 <br /> Engineering work and/or contract bid prep 0 <br /> Reclamation management and/or admin: 5% $764.06 <br /> Contingency: 0 <br /> Total Indirect Cost= $3,078.87 <br /> PHASE 5(BLM) TOTAL BOND AMOUNT (direct+indirect) _ $16,045.33 <br /> 19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.