My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-08-06_INSPECTION - C1981019
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1981019
>
2021-08-06_INSPECTION - C1981019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/9/2021 5:52:25 AM
Creation date
8/9/2021 5:46:54 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Inspection
Doc Date
8/6/2021
Doc Name
Inspection Report
From
DRMS
To
Colowyo Coal Company
Inspection Date
7/30/2021
Email Name
ZTT
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Final East Pit Ditch. <br />GENERAL MINE PLAN COMPLIANCE: <br />Section 36 and Middle Pond. <br />Highwall mining was actively occurring within the Collom Pit at the time of the inspection. The highwall miner <br />was located along the eastern portion of the Collom Pit. <br />Collom Pit with highwall miner. <br />RECLAMATION SUCCESS - Rule 4.15, Rule 3: <br />The remaining portion of the East Pit reclamation remains stable. No signs of rills were observed along the slopes. <br />Normal husbandry practices appear to have occurred along the upper portion of the East Pit relcmation within the <br />Final East Pit Ditch drainage. <br />
The URL can be used to link to this page
Your browser does not support the video tag.