Laserfiche WebLink
Final East Pit Ditch drainage (right side). <br />SUPPORT FACILITIES - Rule 4.04: <br />The loadout area was inspected. Coal is stockpiled above the train loadout in a contained area. The disturbed area <br />associated with the loadout drains into three sediment ponds associated with the area. No issues were observed. <br />Loadout <br />