My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-07-22_REVISION - M2010071 (6)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2010071
>
2021-07-22_REVISION - M2010071 (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2025 5:31:35 AM
Creation date
7/26/2021 6:20:28 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2010071
IBM Index Class Name
REVISION
Doc Date
7/22/2021
Doc Name
Request For Amendment To Permit
From
City of Lafayette
To
DRMS
Type & Sequence
AM2
Email Name
AME
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Design Report <br /> Goose Haven Reservoir Cell 2A <br /> May 14, 2021 <br /> Page 5 of 7 <br /> embankment toe drain. The Project Construction Specifications require the toe drain outlets to <br /> discharge freely into a location where flow rates can be measured, such as a gallery, manhole, <br /> vault, or headwall to be approved at the time of construction by the Engineer. The seepage flows <br /> will be measured using a container of a known volume such as a five-gallon bucket and a <br /> stopwatch. <br /> The gage rod will extend along the upstream side of the embankment from the Cell 2A outlet to <br /> within 1 ft of the crest of the embankment. The gage rod markings will indicate the vertical distance <br /> from the invert elevation of the entrance to the outlet. The gage will be marked in feet and tenths <br /> of feet. Details for construction of the gage rod are shown on sheet C-31 of the Project <br /> Construction Drawings. <br /> 10 MECHANICAL AND ELECTRICAL DESIGN <br /> The transfer of stored water from Cell 2A to Cell 2 will be controlled by a 24-inch diameter sluice <br /> gate operated from the top of the transfer box, as shown on sheet HS-62 of the Project <br /> Construction Drawings. Specification Section 35 22 26 addresses requirements for sluice gates. <br /> Mechanical components other than the sluice gate are not planned for the Cell 2A project. The <br /> design of Cell 2A does not include electrical components. <br /> BRIERLEY <br /> ASSOCIATES <br /> Creating Space Underground <br />
The URL can be used to link to this page
Your browser does not support the video tag.