My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-07-22_REVISION - M2010071 (6)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2010071
>
2021-07-22_REVISION - M2010071 (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2025 5:31:35 AM
Creation date
7/26/2021 6:20:28 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2010071
IBM Index Class Name
REVISION
Doc Date
7/22/2021
Doc Name
Request For Amendment To Permit
From
City of Lafayette
To
DRMS
Type & Sequence
AM2
Email Name
AME
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Design Report <br /> Goose Haven Reservoir Cell 2A <br /> May 14, 2021 <br /> Page 6 of 7 <br /> 11 COST ESTIMATE <br /> The following table provides a cost estimate for construction of Cell 2A, including the construction <br /> of the embankment and various pipelines and other hydraulic structures. The cost estimate was <br /> prepared with input from Weiland, Inc. and Rock Products. Note that all costs include contractor <br /> overhead and profit. <br /> RESERVOIR Unit Unit Cost Quantity Extended Cost <br /> Embankment Costs <br /> Excavation for embankment only Cubic Yards 1.50 261,280 391,920 <br /> Dewatering Per Month <br /> Cost 500.00 36 18,000 <br /> General Embankment Fill & <br /> Embankment Core material Cubic Yards <br /> placement' 5.00 283,548 1,417,740 <br /> Chimney, Blanket, &Toe Drain <br /> Sand/Aggregate Cubic Yards 11.00 9,327 102,597 <br /> Toe Drain Pipe, 6-inch diameter Linear Feet 30.00 3,643 109,290 <br /> Rip Rap Ton 65.35 11,875 776,031 <br /> Type II Rip Rap Bedding Ton 32.00 9,037 289,184 <br /> Topsoil Replacement Cubic Yards 2.75 2,556 7,029 <br /> Reseeding Topsoil Acres 1,500.00 2 3,564 <br /> Hydraulic Element Costs <br /> Cell 2A-2 Transfer Box Lump Sum 300,000.00 1 300,000 <br /> Tunneling and 36-inch diameter <br /> Casing Pipe for Outlet Linear Feet 954.00 160 152,640 <br /> Diversion Boxes Lump Sum 50,000.00 2 100,000 <br /> Inlet Pipe/Bypass Pipe Linear Feet 354.00 3,431 1,214,574 <br /> Outlet Pie Linear Feet 354.00 400 141,600 <br /> Gage Rod Lump Sum 10,000.00 1 10,000 <br /> Design Engineering 200,000 <br /> Construction Engineering Oversight 100,000 <br /> Total 5,334,169 <br /> Notes: <br /> 1. Assumes material is generated onsite <br /> 2. Quantities for the embankment were generally provided by Weiland, Inc. Costs for the <br /> embankment and hydraulic elements were generally provided by Rock Products of Colorado <br /> BRIERLEY <br /> ASSOCIATES <br /> Creating Space Underground <br />
The URL can be used to link to this page
Your browser does not support the video tag.