Laserfiche WebLink
Design Report <br /> Goose Haven Reservoir Cell 2A <br /> May 14, 2021 <br /> Page 4 of 7 <br /> 5 HYDROLOGY <br /> Section 6 of the Project Breach Inundation Mapping Report discusses of the inflow hydrology <br /> parameters and modeling. Section 7 of the Project Breach Inundation Mapping Report describes <br /> the hydrologic hazard evaluation and concludes that a Low Hydrologic Hazard classification is <br /> appropriate. <br /> 6 HYDRAULICS <br /> Section 2.3 of the Project Breach Inundation Mapping Report discusses the primary outlet for Cell <br /> 2A. Additionally, an overflow rating curve and a primary outlet capacity curve are provided on <br /> sheet HS-64 of the Project Construction Drawings. <br /> 7 GEOTECHNICAL DESIGN <br /> Geotechnical design considerations are discussed in the Project Geotechnical Design Report, <br /> The Project Geotechnical Design Report includes: <br /> • A discussion of the geology and subsurface conditions <br /> • Embankment foundation considerations <br /> • Seepage analysis of the proposed embankment <br /> • Slope stability analyses of the proposed embankment <br /> • Filter compatibility design for the embankment chimney, blanket, and toe drains, and the <br /> outlet pipe filter diaphragm. <br /> • Discussion and analysis for the embankment camber design <br /> • Embankment slope protection design <br /> • Dam freeboard analysis <br /> • Recommendations for trenchless construction for the outlet pipe <br /> 8 STRUCTURAL DESIGN <br /> The basis of design for the transfer box structures is described on the first page of the Transfer <br /> Box Structural Engineering Calculations. <br /> 9 INSTRUMENTATION PLAN <br /> Instruments will be used to monitor the performance of the dam over time. In accordance with the <br /> Rules and Regulations, Low Hazard dams are required to have seepage measurement devices <br /> and a gage rod. Specification Section 31 23 20 contains requirements for the seepage <br /> measurement and the gage rod. <br /> Seepage will be measured at the Flow Measurement Structure shown on sheet C-13 of the Project <br /> Construction Drawings. Sheet C-13 shows two toe drain outlets; one outlet will connect to the <br /> eastern embankment toe drain and the second outlet will connect to the western and northern <br /> BRIERLEY <br /> ASSOCIATES <br /> Creating Space Underground <br />