Laserfiche WebLink
Mobilization Worksheet Cont'd Task# l0A Page 2 of 2 <br /> EQUIPMENT HAUL DISTANCE and Time <br /> Nearest Major City or Town within project area region: RIFILE,CO <br /> Total one-way travel distance: 70.00 miles <br /> Average Travel Speed: 40.00 mph <br /> Total Non-Roadable Mob/Demob Cost* $2,655.00 <br /> `* two round trips with haul rig: <br /> Total Roadable Mob/Demob Cost** <br /> ** one round trip,no haul rig: $321.34 <br /> Transportation Cycle Time: <br /> Non- <br /> Roadable Roadable <br /> Equipment Equipment <br /> Haul Time(Hours): 1.75 1.75 <br /> Return Time(Hours): 1.75 1.75 <br /> Loading Time(Hours): 0.50 NA <br /> Unloading Time(Hours): 0.50 NA <br /> Subtotals: 4.50 3.50 <br /> JOB TIME AND COST <br /> Total job time: 9.00 Hours <br /> Total job cost: $2,976 <br /> CIRCES Cost Estimating Software <br />