Laserfiche WebLink
Page 1 of 2 <br /> EQUIPMENT MOBILIZATION/DEMOBILIZATION <br /> Task description: Initial Mobilization <br /> Site: Shale Core 2020-03 Permit Action: New App Permit/Job#: P2021003 <br /> PROJECT IDENTIFICATION <br /> Task#: 10A State: Colorado Abbreviation: None <br /> Date: 5/12/2021 County: Rio Blanco Filename: P003-10a <br /> User: ACY <br /> Agency or organization name: DRMS <br /> EQUIPMENT TRANSPORT RIG COST <br /> Shift basis: 1 per day <br /> Cost Data Source: CRG Data <br /> Truck Tractor Description: GENERIC ON-HIGHWAY TRUCK TRACTOR,6X4,DIESEL POWERED, <br /> 400 HP(2ND HALF,2006) <br /> Truck Trailer Description: GENERIC FOLDING GOOSENECK,DROP DECK EQUIPMENT <br /> TRAILER(25T,50T,AND IOOT) <br /> Cost Breakdown: <br /> Available Rig Capacities 0-25 Tons 26-50 Tons 51+Tons <br /> Ownership Cost/Hour: $17.20 $29.63 $38.69 <br /> Operating Cost/Hour: $26.56 $47.02 $55.69 <br /> Operator Cost/Hour: $23.63 $23.63 $23.63 <br /> Helper Cost/Hour: $0.00 $23.53 $23.53 <br /> Total Unit Cost/Hour: $67.39 $123.81 $141.54 <br /> NON ROADABLE EQUIPMENT: <br /> Machine Weight/ Owner ship Haul Rig Fleet Haul Trip Return Trip DOT Permit <br /> Description Unit Cost/hr/unit Cost/hr/uni Size Cost/hr/ Cost/hr/fleet Cost/fleet <br /> (TONS) t fleet <br /> Cat D6T XL 25.01 $73.64 $67.39 1 $141.03 $67.39 $250.00 <br /> Drill/Broadcast 25.00 $6.72 $67.39 1 $74.11 $67.39 $250.00 <br /> Seeder with <br /> Tractor <br /> Subtotals: 1 $215.14 $134.78 $500.00 <br /> ROADABLE EQUIPMENT: <br /> Machine Description Total Cost/hr/ Fleet Size Haul Trip Return Trip <br /> unit Cost/hr/fleet Cost/hr/fleet <br /> Flatbed Truck,4x2, 15K GVW $50.90 1 $50.90 $50.90 <br /> Light Duty Pickup,4x4,3/4 T. $40.91 1 $40.91 $40.91 <br /> Subtotals: $91.81 $91.81 <br /> CIRCES Cost Estimating Software <br />