Laserfiche WebLink
Pagel of 2 <br /> EQUIPMENT MOBILIZATIONMEMOBILIZATION <br /> Task description: Secondary Mobilization <br /> Site: Shale Core 2020-03 Permit Action: New App Permit/Job#: P2021003 <br /> PROJECT IDENTIFICATION <br /> Task#: lOB State: Colorado Abbreviation: None <br /> Date: 5/12/2021 County: Rio Blanco Filename: P003-10b <br /> User: ACY <br /> Agency or organization name: DRMS <br /> EQUIPMENT TRANSPORT RIG COST <br /> Shift basis: 1 per day <br /> Cost Data Source: CRG Data <br /> Truck Tractor Description: GENERIC ON-HIGHWAY TRUCK TRACTOR, 6X4,DIESEL POWERED, <br /> 400 HP(2ND HALF,2006) <br /> Truck Trailer Description: GENERIC FOLDING GOOSENECK,DROP DECK EQUIPMENT <br /> TRAILER(25T,50T,AND 100T) <br /> Cost Breakdown: <br /> Available Rig Capacities 0-25 Tons 26-50 Tons 51+Tons <br /> Ownership Cost/Hour: $17.20 $29.63 $38.69 <br /> Operating Cost/Hour: $26.56 $47.02 $55.69 <br /> Operator Cost/Hour: $23.63 $23.63 $23.63 <br /> Helper Cost/Hour: $0.00 $23.53 $23.53 <br /> Total Unit Cost/Hour: $67.39 $123.81 $141.54 <br /> NON ROADABLE EQUIPMENT: <br /> Machine Weight/ Owner ship Haul Rig Fleet Haul Trip Return Trip DOT Permit <br /> Description Unit Cost/hr/unit Cost/hr/uni Size Cost/hr/ Cost/hr/fleet Cost/fleet <br /> (TONS) t fleet <br /> Subtotals: $0.00 $0.00 $0.00 <br /> ROADABLE EQUIPMENT: <br /> Machine Description Total Cost/hr/ Fleet Size Haul Trip Return Trip <br /> unit Cost/hr/fleet Cost/hr/fleet <br /> Li ht-Dty Pickup,4x4,3/4 T. $40.91 1 $40.91 $40.91 <br /> Subtotals: $40.91 $40.91 <br /> CIRCES Cost Estimating Software <br />