My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-05-12_REVISION - M2012032
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2012032
>
2021-05-12_REVISION - M2012032
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2025 6:24:47 AM
Creation date
5/17/2021 6:08:33 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2012032
IBM Index Class Name
REVISION
Doc Date
5/12/2021
Doc Name
Adequacy Review Response
From
Ouray Silver Mines, Inc.
To
DRMS
Email Name
LJW
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
242
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
QURAY SILVER MINES <br /> to the surface facilities. Reagent transfer from shipping containers for dilutions and use occurs <br /> entirely within secondary containment. <br /> 3.9.2 Loading/Unloading Procedures(40 CFR 112.7(h)(2)&(3)) <br /> Vehicle and site equipment filling operations are conducted by facility personnel trained in <br /> proper discharge prevention procedures.The equipment operator or other facility personnel <br /> remain with the equipment while fuel is being transferred. Transfer operations are performed <br /> according to the procedures outlined in Table 3.3. This table is posted at all loading/unloading <br /> locations. <br /> Table 3.3 Hydrocarbon Transfer Procedures <br /> Prior to transfer <br /> Inspect area and position spill kit for rapid response to any discharge <br /> Visually check all hoses for leaks and wet spots <br /> Verify that sufficient volume is available in the receiving container <br /> Secure the delivery vehicle with wheel chocks, interlocks and parking brake <br /> Verify proper alignment of valves <br /> Verify proper functioning of the pumping system <br /> When making a connection,shut off the vehicle engine <br /> Use a drip pan <br /> During transfer <br /> With Class 3 materials,shut off the vehicle engine unless required to operate a pump <br /> Driver must remain with the vehicle at all times during transfer operation <br /> Periodically inspect systems, hoses and connections <br /> Keep valves and pressure relief valves on the receiving container open <br /> Monitor the fill level in the receiving container to prevent overflow <br /> Monitor rate of flow <br /> When topping off, reduce flow rate to prevent overflow <br /> Before disconnecting <br /> Verify the transfer operation is completed <br /> Verify hoses are drained <br /> Close all tank and loading valves <br /> Close all vehicle internal,external and dome cover valves <br /> Disconnect hoses <br /> Cap hoses and other connecting devices before moving them <br /> Close all connections to the receiving container <br /> Inspect area for any discharge,cleanup immediately <br /> Return tools and spill kit to their proper locations <br /> Spill Prevention Control and Countermeasure Plan 19 P a g e <br />
The URL can be used to link to this page
Your browser does not support the video tag.