My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-05-12_REVISION - M2012032
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2012032
>
2021-05-12_REVISION - M2012032
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2025 6:24:47 AM
Creation date
5/17/2021 6:08:33 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2012032
IBM Index Class Name
REVISION
Doc Date
5/12/2021
Doc Name
Adequacy Review Response
From
Ouray Silver Mines, Inc.
To
DRMS
Email Name
LJW
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
242
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OLR4Y SIIV MIA11 <br /> The 10,000 gallon double-walled diesel tank (C-1)was installed new in 2012 and the 1,000 <br /> gallon double walled unleaded tank was installed new in 2021. For this reason, a Steel Tank <br /> Institute (STI) Standard testing for the Inspection of Aboveground Storage Tanks, SP-001 (2005 <br /> version) will not be required until March 2027 for the 10,000 gallon tank and 2036 for the 1,000 <br /> gallon tank. <br /> 3.7 Personnel,Training and Discharge Prevention Procedures(40 CFR 112.7(f)) <br /> The Environmental Specialist is the facility designee and is responsible for hydrocarbon <br /> discharge prevention, control and response preparedness activities at this facility. <br /> OSMI management has instructed hydrocarbon handling personnel in the operation and <br /> maintenance of pollution prevention equipment, discharge procedure protocols, applicable <br /> pollution control laws, rules and regulations, general facility operations and the content of this <br /> SPCC Plan. Any new personnel with handling responsibilities are provided with this same <br /> training prior to being involved in any operation.This is provided during initial employee <br /> induction training and training logs are kept. <br /> Annual discharge prevention briefings are held during Annual Refresher Training for all facility <br /> personnel.Those personnel involved in operations will receive additional training that is <br /> focused on adherence to the discharge prevention measures presented in this Plan. The <br /> training will include known discharge events and maintenance conducted. During training <br /> sessions, facility operators will have the opportunity to share suggestions concerning health, <br /> safety and environmental issues encountered during facility operations. <br /> 3.8 Security(40 CFR 112.7(g)) <br /> Access to the facility is gated and locked.The site's topography acts as a natural barrier to <br /> trespassing. <br /> 3.9 Tank-Truck Loading/Unloading Rack Requirements(40 CFR 112.7(h)) <br /> All fuel products on site are supplied by mobile fuel trucks brought on site periodically. As fuel <br /> and reagents present the main potential for a discharge, OSMI management is committed to <br /> ensuring the safe transfer of these products. <br /> 3.9.1 Secondary Containment(40 CFR 112.7(h)(1)) <br /> Product delivery will be by trucks with secondary containment. There is also a collection ditch <br /> that partially protects the site from a discharge. Transfer of fuel to an AST takes place adjacent <br /> Spill Prevention Control and Countermeasure Plan 181 P a g e <br />
The URL can be used to link to this page
Your browser does not support the video tag.