Laserfiche WebLink
Bunn Ranch Pit TR4 Cost Estimate April 2021 <br /> BULLDOZER WORK <br /> Task description: Distribute topsoil <br /> Site: Bunn Ranch Pit Permit Action: TR4 2021 Permit/Job#: M1980131 <br /> PROJECT IDENTIFICATION <br /> Task#: 05B State: Colorado Abbreviation: None <br /> Date: 4/26/2021 County: Moffat Filename: TR4 <br /> User: RAR <br /> Agency or organization name: DRMS <br /> HOURLY EQUIPMENT COST <br /> Basic Machine: Cat D9T-9SU <br /> Horsepower: 405 <br /> Blade Type: Semi-Universal <br /> Attachment: NA <br /> Shift Basis: 1 per day <br /> Data Source: (CRG) <br /> Cost Breakdown: <br /> Utilization% <br /> Ownership Cost/Hour: $156.88 NA <br /> Operating Cost/Hour: $127.87 100 <br /> Ripper own. $0.00 NA <br /> Cost/Hour: <br /> Ripper op. Cost/Hour: $0.00 0 <br /> Operator Cost/Hour: $41.30 NA <br /> Total unit Cost/Hour: $326.04 <br /> Total Fleet Cost/Hour: $6.52.09 <br /> MATERIAL QUANTITIES <br /> Initial Volume: 99,589 <br /> Swell factor: 1.000 <br /> Loose volume: 99,589 LCY <br /> Source of estimated volume: Transported volume <br /> Source of estimated swell Cat Handbook <br /> factor: <br /> HOURLY PRODUCTION <br /> Average push distance: 100 feet <br /> Unadjusted hourly 1,243.2 LCY/hr <br /> production: <br /> Materials consistency Loose stockpile 1.2 <br /> description: <br /> Average push 0% <br /> gradient: <br /> Average site altitude: 6,200 feet <br /> Material weight: 1,6001bs/LCY <br /> Weight description: Top Soil <br /> 9 <br />