My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-04-30_REVISION - M1980131 (3)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980131
>
2021-04-30_REVISION - M1980131 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2024 9:45:35 AM
Creation date
5/4/2021 7:00:27 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980131
IBM Index Class Name
Revision
Doc Date
4/30/2021
Doc Name
Reclamation Cost Estimate
From
DRMS
To
Bunn Ranch Pit
Type & Sequence
TR4
Email Name
RAR
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bunn Ranch Pit TR4 April 2021 <br /> Haul and Return Time <br /> Length Grade Res. Rolling Total Res. Travel Time Source <br /> (feet) (%) Res. (%) (%) (minutes) <br /> Haul Route: 100 0.00 5.00 5.00 0.0884 (Cat HB) <br /> Return Route: 100 0.00 5.00 5.00 0.0799 (Cat HB) <br /> Total Travel Time: 0.1683 minutes <br /> Total Cycle Time: 0.6383 minutes <br /> Load Bucket Capacity <br /> Rated Capacity: 7.50 LCY(heaped) <br /> Bucket Fill Factor: 0.975 Loose material-uniform aggregates to 1/8"(95-100%)0.975 <br /> Adjusted Capacity: 7.31 LCY <br /> Job Condition Correction Factors <br /> Site Altitude: 6200 feet <br /> Source <br /> Altitude Adj: 1.00 (CAT HB) <br /> Job Efficiency: 0.83 (1 shift/day) <br /> Net Correction: 0.83 multiplier <br /> Unadjusted Hourly Unit Production: 687.33 LCY/Hour <br /> Adjusted Hourly Unit Production: 570.48 LCY/Hour <br /> Adjusted Hourly Fleet Production: 1,140.97 LCY/Hour <br /> JOB TIME AND COST <br /> Fleet size: 2 Loader(s) Total job time: 117.83 Hours <br /> Unit cost: $0.271 /LCY Total job cost: $36,483 <br />
The URL can be used to link to this page
Your browser does not support the video tag.