Laserfiche WebLink
Bunn Ranch Pit TR4 Cost Estimate April 2021 <br /> Job Condition Correction Factor Source <br /> Operator Skill: 0.900 (AB.AVG.) <br /> Material consistency: 1.200 (CAT HB) <br /> Dozing method: 1.000 (GEN.) <br /> Visibility: 1.000 (AVG.) <br /> Job efficiency: 0.830 (1 SHIFT/DAY) <br /> Spoil pile: 0.800 (FND-RF) <br /> Push gradient: 1.000 (CAT HB) <br /> Altitude: 1.000 (CAT HB) <br /> Material Weight: 1.438 (CAT HB) <br /> Blade type: 1.000 (PAT) <br /> Net correction: 1.0312 <br /> Adjusted unit 1,281.99 LCY/hr <br /> production: <br /> Adjusted fleet 2563.98 LCY/hr <br /> production: <br /> JOB TIME AND COST <br /> Fleet size: 2 Dozer(s) <br /> Unit cost: $0.254/LCY <br /> Total job time: 38.84 Hours <br /> Total job cost: $25,328 <br /> 10 <br />