My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-04-27_INSPECTION - C1981035
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1981035
>
2021-04-27_INSPECTION - C1981035
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2021 1:06:09 PM
Creation date
4/27/2021 12:25:59 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981035
IBM Index Class Name
Inspection
Doc Date
4/27/2021
Doc Name
Inspection Report
From
DRMS
To
GCC Energy, LLC
Inspection Date
4/22/2021
Email Name
LJW
JHB
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
April 22,2021 C-1981-035/King Coal Mine LJW <br /> around and lay down area are addressed in the Division's Preliminary Adequacy Review dated Apri123, 2021. <br /> The ranch road leading away from the proposed turn around area and lay down yard is pre-existing but will require <br /> upgrades. The road varies in grade and contains some minor erosion features. On site discussions with the <br /> Operator indicate that the proposed upgrades include smoothing and leveling,water bar and ditch repairs and <br /> minor berm repairs. Examples of the current conditions of the road can be seen in Photos Six and Seven. Specific <br /> concerns related to the ranch road are also addressed in the Divisions Preliminary Adequacy Review dated April <br /> 23,2021. <br /> ENFORCEMENT ACTIONS/COMPLIANCE <br /> No enforcement actions were initiated as a result of this inspection,nor are any pending. <br /> PHOTOGRAPHS <br /> Photo One: View northeast,showing the lower refuse pile at the King I facility. Material <br /> was actively being deposited and compacted during the inspection. <br /> Number of Partial Inspection this Fiscal Year: 7 <br /> Number of Complete Inspections this Fiscal Year: 3 <br /> Page 3 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.