Laserfiche WebLink
April 22,2021 C-1981-035/King Coal Mine LJW <br /> Photo Two: View southwest,showing another portion of the lower refuse pile. <br /> The material is being installed in lifts,and in a manner to direct all drainage to <br /> the water control devices. No ponding or impounded surface water was <br /> observed during the inspection. <br /> A ra <br /> r� v <br /> Photo Three: View northeast,showing the out slope of the refuse pile. The out <br /> slope appeared stable and in good condition at the time of the inspection. <br /> Number of Partial Inspection this Fiscal Year: 7 <br /> Number of Complete Inspections this Fiscal Year: 3 <br /> Page 4 of 6 <br />