My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-03-25_GENERAL DOCUMENTS - C1982057
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1982057
>
2021-03-25_GENERAL DOCUMENTS - C1982057
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2021 6:44:30 AM
Creation date
3/30/2021 1:30:13 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982057
IBM Index Class Name
General Documents
Doc Date
3/25/2021
Doc Name Note
For SL6
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
Seneca Property LLC
Permit Index Doc Type
Findings
Email Name
RAR
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
News Media, Steamboat Pilot once weekly for four consecutive weeks,beginning 27 October 2019. Seneca <br /> Property LLC also notified land owners within and adjacent to the mine permit area,and other interested <br /> parties of the application for bond release,as required by Rule 3.03.2(1). <br /> No comments,written objections,or requests for an informal conference regarding the bond release <br /> application were received by the Division. <br /> The Division scheduled and conducted a bond release inspection on 21 July 2020. The site inspection was <br /> conducted in accordance with Rule 3.03.2(2). The Division notified the operator, surface owners,Bureau of <br /> Land Management(BLM),the Office of Surface Mining(OSM),and the Colorado State Land Board of the <br /> inspection via certified mail. Attendees included: <br /> o Miranda Kawcack, Seneca Properties LLC (SPL) <br /> o Christine Belka, Office of Surface Mining Reclamation and Enforcement(OSMRE) <br /> o Ana Lash,Hayden Library Director <br /> o Christine Epp,Hayden Library Board <br /> o Robin Reilley, GISP; Colorado Division of Reclamation,Mining,and Safety(DRMS) <br /> DRMS conducted the bond release inspection with available sister agencies in attendance on 21 July 2020 <br /> and provided the associated inspection report to SPL,BLM,and OSMRE via electronic transmission on 30 <br /> July 2020. DRMS received the OSMRE inspection report from Christine Belka on 3 August 2020. <br /> Reclamation for the requested Phase II,and phase II/III SL6 bond release areas was conducted between 1990 <br /> and 2007. The reclamation parcels selected for the SL6 bond release were seeded between 2003 and <br /> 2007. The requested lands comprise bond release block 3 (BRB3),totaling 804.1 acres, and an additional <br /> 12.5 acres of permanent roads,bringing the total to 816.6 acres. The phase II/III areas represents the <br /> southern portion of the BRB while the phase III represents the northern portion. Map 1 submitted with <br /> the application illustrate the parcels associated with each requested phase. Reclamation activities are <br /> documented in the Annual Reclamation Reports submitted to DRMS. All areas in this application <br /> received formal phase I bond release through permitting action SL3. A portion of the phase II/III request <br /> received formal phase II release through permitting action SL5. The remainder is requested for phase II <br /> in the SL6 permitting action. A map of the bond release parcels was provided in the application. <br /> Adequacy Review <br /> Adequacy questions were provided to SPL on 20 August 2020 requesting a sediment demonstration,water <br /> quality information and additional data on TSS for ponds and outfalls. Updates to application pages were <br /> also requested to assure that the correct year of data had been submitted. The sediment demonstration and <br /> additional water quality information was received by DRMS on 12 January 2021. <br /> II. CRITERIA AND SCHEDULE FOR BOND RELEASE <br /> The Division evaluated Seneca Coal Company's request for Phase II and II/III bond release on 816.6 acres in <br /> the SL6 application. Under Colorado's Permanent Program,the process of releasing the reclamation bond for <br /> a mine site is explained in Rule 3.03 and further described in the Division's 1995 Guideline Regarding <br /> Selected Coal Mining Bond Release Issues. The bond release process involves three phases. At Phase II, <br /> Rule 3.03.1(2)(b) states: <br /> "Up to eighty-five percent of the applicable bond amount shall be released upon the establishment of <br /> Permit Number C1982057 Prepared by: R.Reilley NIS,GISP <br /> SL6 Phase II and III Page 4 of 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.