L PROCEDURES AND SUMMARY OF THE REVIEW PROCESS <br /> Seneca Property LLC applied for partial bond release under the Colorado Surface Coal Mining and <br /> Reclamation Act following reclamation of the Seneca II-W Mine. The mine is located in Routt <br /> County, Colorado. The specific areas relating to the SL6 bond release request are included within the <br /> permit area described as follows: <br /> Township 5 North Range 88 West, 6th Prime Meridian <br /> Section 9: Portions of SE'/4NE'/4,NE'/4SE'/4,and W'/2NE1/4 <br /> Section 10: S 1/2S1/2NW1/4, SW 1/4, SE 1/4,Portions of S'/2NE 1/4 <br /> Section 11: Portions of S 1/2S 1/2NW1/4 <br /> Section 14: Portions of SW1/4,NW1/4,and S 1/2S1/2NE1/4 <br /> Section 15: All <br /> Section 16: Portions of W1/2NE1/4, SE1/4NW1/4,NE1/4SW1/4 and SE1/4 <br /> Section 21: Portions of E1/2NE1/4 <br /> Section 22: NW1/4,NE1/4,NE1/2SE1/4, SW1/4SE1/4,Portions of N1/2SW1/4 and SW1/4SE1/4 <br /> Section 23: NW1/4, SW1/4, W1/2E 1/2,W1/2,E1/2E 1/2 <br /> Section 26: W1/2,W1/2E 1/2,and Portions of W1/2E 1/2 SE1/4 <br /> Section 27: E1/2 <br /> Section 34: NE 1/4,NE1/2SE1/4,and Portions of N1/2S1/2SE1/4 <br /> Section 35: NW1/4,W1/2NE1/4,N1/2SW1/4,and Portions of N1/2S1/2SW1/4,NW1/4SE1/4, <br /> SW1/4SE1/4 SE1/4,NW1/4NE 1/4 SE1/4,and W1/2E 1/2NE 1/2. <br /> All areas are west of the 6th Principal Meridian,totaling 3,878.50 acres. The permit area can be found on the <br /> USGS Quadrangle 7.5 Minute Series Maps of Hayden Gulch,Hayden,Dunckley and Mt. Harris. The <br /> following table(Table 1),illustrates the history of previous bond release submittals. <br /> Table 1. Summary of Past Bond Releases at Trapper Mine and Acreage Adjustments <br /> Submittal Proposed Released Released Released Reduction in <br /> Decision Area Ph I Area Ph II Area Ph III Liability <br /> Date(s) (acres) (acres) (acres) <br /> SLO1 Withdrawn $0.00 <br /> SL02 5 May 2010 721.90 0.0 $2,038,488.00 <br /> SL03 21 March 2011 412.35 0.0 $2,335,430.00 <br /> SL04 19 Dec 2013 127.65 0.0 0.0 $801,465.00 <br /> SL05 27 Aug 2014 0.0 800.80 0.0 $87,927.00 <br /> SL06 pending 0.0 379.50 816.6 $2,396,812.54 <br /> SL07 pending 367.00 <br /> This permitting action represents an application for Phase III bond release comprising 437.1 acres and Phase <br /> II and Phase III combined,comprising 379.5 acres, for a total of 816.6 acres of reclaimed land. The <br /> requested bond release(SL6),was received by the Division on 28 October 2019. The application was <br /> deemed complete on 16 December 2019,after the Division received proof of publication of the applicant's <br /> public notice. Seneca Property LLC published notice of the bond release application in Colorado Mountain <br /> Permit Number C1982057 Prepared by: R.Reilley NIS,GISP <br /> SL6 Phase II and III Page 3 of 16 <br />