My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-03-05_REVISION - M1977141
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977141
>
2021-03-05_REVISION - M1977141
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/10/2025 2:17:07 AM
Creation date
3/8/2021 7:18:30 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977141
IBM Index Class Name
REVISION
Doc Date
3/5/2021
Doc Name
Request for Technical Revision
From
Aggregate Industries - WCR, Inc.
To
DRMS
Type & Sequence
TR5
Email Name
AME
MAC
AWA
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5. Point files of all field survey data,including control shall be delivered in.csv format. Any <br /> point code description data sets shall be included with point files. <br /> 6. Submit PDF of the completed topography survey to the Owner. <br /> B. Site Photos: <br /> 1. Field survey photos shall be included with the topographical survey. <br /> C. Site Staking: <br /> 1. Provide site control staking as required for site development. Work with the Owner to <br /> determine amount of staking to be completed. <br /> PART 2 - PRODUCTS -(NOT USED) <br /> PART 3 - EXECUTION <br /> 3.1 INITIAL SURVEY <br /> A. An initial survey shall be performed to document existing grade prior to excavation,fill(where <br /> fill is planned),and riprap placement as shown on the drawings. <br /> B. Results of the initial survey shall be submitted to Engineer at least seven days prior to <br /> commencement of any excavation activities.The initial survey shall be conducted within a <br /> single one week period. <br /> 3.2 AS-BUILT FINAL SURVEY <br /> A. The following shall be included in the final topography survey: <br /> 1. Survey datum and units: the vertical and horizontals datum shall meet state and local <br /> guidelines. The datum and units shall be provided with the survey,including coordinate <br /> system,foot units(international,U.S.survey),ground conversion factors(as applicable), <br /> etc. <br /> a. All surveys shall be spatially tied in and geo-referenced. A datum specific only to the <br /> development area shall not be used. <br /> b. The contractor shall provide all digital source data(i.e.,for Trimble equipment,the.job <br /> file)and the RTK survey report. <br /> 2. Site topography including but not limited to: <br /> a. Existing ground topography shall be recorded with a maximum grid spacing of 100 FT. <br /> Topography shall be presented in 5 FT intervals unless otherwise noted. <br /> b. Grade breaks,including but not limited to:bench crests and toe limits,berms(tops and <br /> toes),depressions,ditches,swales,drainages,hills,rock piles,steep hill faces,road <br /> centerlines,waterlines,wetlands,trees,shrubs,storm water ponds and flow lines. <br /> c. All roads surrounding public and private roads shall be surveyed,including centerline, <br /> edge of asphalt,intersections,shoulder,culverts,and borrow ditches. Private access <br /> roads shall be provided,including two tracks(both tracks to allow for rebuilding if <br /> needed). <br /> d. Adjacent property topography information shall be provided up to 100 FT past the <br /> proposed development area,unless otherwise noted by the Owner. Additional <br /> topography past the initial development area shall include any utilities(road,storm <br /> water,electric)that may need updating due to proposed development. <br /> B. Easements: All utility,property,landscape,road,road right-of-way,floodplain,and public and <br /> z private easement information shall be included and displayed with the survey file for plat and/or <br /> site development. Road centerlines shall be provided for structure setback requirements. <br /> 1. Research of site easements shall be the Contractor's responsibility prior to site surveying. <br /> a. Title reports shall be requested as needed by the Contractor. <br /> 10092468 Aggregate Industries-WCR,Inc <br /> Lyons Quarry Reclamation <br /> SITE[PROPERTY]SURVEY <br /> 022113-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.