Mica Lode, Permit M-1977-144,Technical Revision <br /> Exhibit E—Reclamation Plan <br /> General reclamation plan specifications: <br /> 1. All equipment, structures,fuel, explosives, and stockpiled products will be removed from any <br /> area to be reclaimed. <br /> 2. Stability of slopes and highwalls will be attained by creating slopes of 2.51-1:1V or gentler, or <br /> benched highwalls where it is practicable due to competent outcropping rock. <br /> 3. Backfill materials will be placed and compacted in areas where needed. Materials will be <br /> compacted and shaped so as to not create depressions or impoundments(except those <br /> impoundments specifically described in the reclamation plan). <br /> 4. Graded and backfilled areas, and onsite temporary roads, will be prepared for seeding by <br /> capping with growth medium and ripping as needed for compaction. If existing material on <br /> sloped or graded surfaces is deemed a satisfactory growth medium, no additional capping <br /> material will be spread. <br /> 5. Revegetation seeding will be carried out in a timely manner after the seedbed of an area is <br /> prepared. The same seed mix will be used on all areas to be seeded. <br /> 6. Salvaged woody debris will be respread on certain areas after seeding. <br /> 7. All areas will be monitored for noxious weeds and erosion, and issues will be addressed <br /> promptly. <br /> 8. The same seedmix that is currently approved in this permit will be utilized for future <br /> revegetation. No trees or shrubs are planned to be included in the revegetation plan, however, <br /> since native woody species appear to naturally become established at this site. <br /> Reclamation plan details of the individual affected areas of the permit. <br /> For clarity, naming of the individual areas in this revision mostly conforms to the names previously used <br /> in permit documents. Please refer to the Reclamation Plan Map in Exhibit F,which complements the <br /> descriptions contained below. <br /> Ruby Pit <br /> This pit may be developed as a pond, if it is mined deep enough. If it becomes a pond, slopes will be <br /> created to comply with Rule 3.1.5(7). No swimming is planned for this pond. The pond surface will be <br /> 1.0 acre or less. <br /> Upon the completion of mining all highwall gradients will be reduced to 2.5:1. The east end of the pit <br /> floor will meet the (permanent) Road 383B. <br /> Only limited final reclamation currently exists, as partially sloped highwalls. <br /> There may be limited amounts of oversize materials backfilled in the pit and covered during reclamation. <br /> Slope grading: D8 dozer or equivalent on 4.0 acres of slopes, 16 hours @ $100.00/hr. <br /> Pit floor grading(if pit is not a pond): D8 or equiv. on 1.0 acre of floor, 3 hrs @ $100.00/hr. <br /> Seedbed prep(all areas): spread growth medium and rip, D8 or equiv., 6 hrs @ $100.00/hr. <br /> Placement of oversize material in pit: Cat 830 loader or equiv., 150 CY @ $2.50/CY. <br /> Seeding(all areas): 5.0 acres @ $1,000/ac. <br />