Laserfiche WebLink
MQED-4(East Dump) <br /> Area:4.67 acres. <br /> This area extends from the mouth of the Mica Pit toward the IMC-1 Quarry and the PMD-5 Dump. <br /> All usable material has been extracted and crushed out of this area. The south face still needs to be <br /> sloped. The permanent road along the south edge will continue to be used throughout the reclamation <br /> stage. <br /> Area A <br /> Area: 1.15 acres. <br /> This affected area lies south of Road 38313, and has not been disturbed in many years. There are no <br /> stockpiles or equipment there, and the site is considered reclaimed. <br /> Pit Lake (Mica Pit floor) <br /> This lake/pond will receive some oversize material as backfill,from the adjoining highwall areas. It is <br /> expected that the pond will remain as a permanent feature. Since it existed before 1981, no <br /> augmentation plan is required. <br /> Additional description of this area is included above, under East Highwall and West Highwall. <br /> Stockpile Pad <br /> This named area is now fully included in the MQD-1 Dump and East Dump areas,described above. <br /> Staging Area <br /> This named area is now fully included in the MQD-1 Dump and East Dump areas,described above. <br /> Road 383B <br /> Area: 2.08 acres; length of segment in permit: 3560 LF. <br /> This is a public road extending from the SW corner through the length of the permit to the NE corner. It <br /> has been utilized throughout the life of this mine and such use will continue. The permittee provides <br /> adequate maintenance of the segment of road lying within the permit. The road is a permanent feature <br /> and will remain after final reclamation is completed. (The operator's minor onsite roads will be <br /> reclaimed.) <br />