My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021-02-12_REVISION - M1986015
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1986015
>
2021-02-12_REVISION - M1986015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2024 6:48:59 AM
Creation date
2/17/2021 6:15:50 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1986015
IBM Index Class Name
REVISION
Doc Date
2/12/2021
Doc Name
Adequacy Review Response
From
Castle Aggregate
To
DRMS
Type & Sequence
AM5
Email Name
JPL
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Phase 1 Reclamation <br /> ITEM Quantity Units Unit Cost Total <br /> (1) <br /> Ripping Compacted Areas 19.0 3.8 Hrs. $227.47 $864.00 <br /> Construct 3:1 earth berm 7,000 Lineal Ft 450,000 cy $2.91 $1,309,283.00 <br /> at the perimeter of pit 1 <br /> Topsoil Replacement: 6.7, 6.7 Acres 15,357.0 $1.59/Lcy $24,418.00 <br /> Acres, 6 Inches Deep Ley <br /> Seedbed Preparation (2) 19.0 Acres Acre $138.00 $2,622.00 <br /> Drill Seeding (Includes 19.0 Acres Acre $387.51 $7,363.00 <br /> Seed Cost) (3) <br /> Amendments (4) (Includes 12.3 Acres Acre $180.00 $21,214.00 <br /> Amendment cost) <br /> Mulch and Crimp (5) 19.0 acres Acre $1,207.14 $229936.00 <br /> (Includes Straw) <br /> Weed Control (I"Year) 105.1 Acre $249.37 $26,209.00 <br /> Slurry Wall Construction 70001f if $210.00 $1,4709000.00 <br /> Sub-total $2,866,125.00 <br /> • 43. Please ensure that the items listed on the Phase 2 Reclamation table are clearly <br /> depicted on the Reclamation Plan Map. <br /> ➢ Areas to receive topsoil regrading and seeding are shown on Map F-1 <br /> • 44. Please review the cost estimate for all Phases Ripping Roads and Compacted <br /> Areas in the Phase 2 Reclamation table there appears to be an error,please correct <br /> and update the table as needed. <br /> ➢ Response: <br /> ✓ Based on our recalculation of the cost to rip roads and other compacted <br /> areas, the estimated cost is $1,501.00 <br /> 24 <br />
The URL can be used to link to this page
Your browser does not support the video tag.