2021-02-12_REVISION - M1986015
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1986015
>
2021-02-12_REVISION - M1986015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2024 6:48:59 AM
Creation date
2/17/2021 6:15:50 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1986015
IBM Index Class Name
REVISION
Doc Date
2/12/2021
Doc Name
Adequacy Review Response
From
Castle Aggregate
To
DRMS
Type & Sequence
AM5
Email Name
JPL
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pueblo East, Phase 2 <br /> ITEM Quantity Units Unit Cost Total <br /> (1) <br /> Phase 2 Slumped Slope - Lump - $51,864.00 <br /> Repairs (2)(3) Sum <br /> All Phases, Ripping Rds. 28.0 Acres 6.6 Hrs. $227.47 $1,501.00 <br /> & Compacted Areas <br /> Topsoil Replacement: 0.0 Acres Lcy. $1.59 $0.00 <br /> Current roads to remain <br /> Seedbed Preparation 28.0 Acres Acre $138.00 $3,864.00 <br /> Drill Seeding 28.0 Acres Acre $387.51 $10,850.00 <br /> Amendments (5) 0.0 Acres Acre $984.58 $0.00 <br /> Mulch and Crimp 28.0 Acres Acre $1,207.14 $33,800.00 <br /> Weed Control 28.0 Acres Acre $249.37 $6,982.00 <br /> Total $108,861.00 <br /> • 45. Please provide a detailed summary from where the 200,000 cubic yards of <br /> material needed for the Phase 7 reclamation will be sourced. <br /> ➢ Response: Water depths were measured and recorded by Bishop and Brogden to <br /> determine the amount of water contained in Phase 7 during the spring runoff. <br /> Assumed this represents the high water mark that needs to be backfilled in this <br /> area we calculated the acre feet of water and converted that to cubic yards of <br /> backfill. <br /> ➢ The required backfill will come from the materials originally stripped and stock <br /> piled along the east and north boundaries of the phase 7. Additional Materials <br /> will be available from Phase 1 as the slopes in that area are completed. The final <br /> place to source material would be the north area of phase 2 along the highway. <br /> 25 <br />