Laserfiche WebLink
I I�I�I <br /> �J � ..Acres ♦' <br /> Aeasurement Result ,...._ .... _............ <br /> 12.3 Acres <br /> _.._- .... <br /> s z,. <br /> �a <br /> • 40. Please clearly depict on the Reclamation Plan Map the anticipated pit slope <br /> perimeter location along with the location of the slurry wall. <br /> ➢ Response: See Maps C-1 and F-1 <br /> 0 41. Please ensure that the items listed on the Phase 1 Reclamation table are clearly <br /> depicted on the Reclamation Plan Map. <br /> ➢ Response: See Maps C-1 and F-1 <br /> • 42. Please review the cost estimate for Topsoil Replacement in the Phase I <br /> Reclamation table there appears to be an error please correct and update the table <br /> as needed. <br /> ➢ Response: <br /> Based on our recalculation of the topsoil replacement cost estimate, the cost is <br /> $24,418.00. <br /> 23 <br />